Results 71 to 80 of about 111,050 (304)

Harnessing Fungal Biowelding for Constructing Mycelium‐Engineered Materials

open access: yesAdvanced Engineering Materials, EarlyView.
Mycelium‐bound composites (MBCs) offer low‐carbon alternatives for construction, yet interfacial bonding remains a critical challenge. This review examines fungal biowelding as a biocompatible adhesive, elucidating mycelium‐mediated interfacial mechanisms and their role in material assembly. Strategies to optimize biowelding are discussed, highlighting
Xue Brenda Bai   +2 more
wiley   +1 more source

A New Multi-Objective Hybrid Flow Shop Scheduling Method to Fully Utilize the Residual Forging Heat

open access: yesIEEE Access, 2020
This paper aims to solve the problem of high energy consumption in forging production through energy-saving scheduling. By analyzing the flow shop characteristics of a forging workshop, an energy-efficient hybrid flow shop scheduling problem with forging
Qiang Cheng   +5 more
doaj   +1 more source

Recent Progress in Oxide‐Based Na‐Ion Conductors

open access: yesAdvanced Engineering Materials, EarlyView.
Recent advances in oxide‐based sodium‐ion conductors are reviewed, focusing on β/β″‐alumina, NASICON‐type compounds, and Na5YSi4O12‐type (N5) silicates, together with emerging perovskite and layered oxides. Improvements in ionic conductivity, compositional tuning, and processing are highlighted.
Bowei Xun   +3 more
wiley   +1 more source

Energy-aware scheduling optimization in hybrid flow shops using artificial bee colony algorithm

open access: yesJournal of Mechanical Engineering and Sciences
Hybrid flow shop scheduling (HFS) involves optimizing production processes, where different manufacturing stages have varying capacities, combining parallel machine and flow shop scheduling to improve efficiency and reduce production time. Incorporating
Mohd Abdul Hadi Osman   +3 more
doaj   +1 more source

A New Sustainable Scheduling Method for Hybrid Flow-Shop Subject to the Characteristics of Parallel Machines

open access: yesIEEE Access, 2020
Sustainable production for hybrid flow shop scheduling problem (HFSP) has attracted growing attention due to the environment and economy pressure in industry.
Lin Kong   +5 more
doaj   +1 more source

Distribution planning in a weather-dependent scenario with stochastic travel times: a simheuristics approach [PDF]

open access: yes, 2018
In real-life logistics, distribution plans might be affected by weather conditions (rain, snow, and fog), since they might have a significant effect on traveling times and, therefore, on total distribution costs.
Cavero-Lázaro, Marta   +4 more
core   +3 more sources

Numerical Investigation of a Dual‐Mode Shape Memory Alloy Stent Enabling Secondary Expansion via Focused Ultrasound: A Potential Strategy for Correcting In‐Stent Restenosis

open access: yesAdvanced Engineering Materials, EarlyView.
This study demonstrates a novel noninvasive strategy to treat in‐stent restenosis using focused ultrasound. A shape memory alloy stent initially expands at body temperature. If restenosis occurs, targeted ultrasound heating thermally actuates the stent, enabling a secondary expansion to reopen the blocked vessel, offering a potential alternative to ...
Stephen Asare   +3 more
wiley   +1 more source

Optimization of hybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization

open access: yesJournal of Mechanical Engineering and Sciences
Hybrid Flow Shop Scheduling (HFS) has garnered significant interest in terms of problem formulation and solution approaches. This work introduces an optimization approach for a case study on a hybrid flow shop scheduling problem.
Siti Nur Hazwani Husna Mohd Hata   +2 more
doaj   +1 more source

Multi-stage hybrid flow shop scheduling problem with lag, unloading, and transportation times [PDF]

open access: yesPeerJ Computer Science
This study aims to address a variant of the hybrid flow shop problem by simultaneously integrating lag times, unloading times, and transportation times, with the goal of minimizing the maximum completion time, or makespan.
Lotfi Hidri, Mehdi Tlija
doaj   +2 more sources

Abandoned project restoration model (APRM) for residential construction projects [PDF]

open access: yes, 2017
Incompletion of construction projects is a common phenomenon in Malaysia. Project abandonment has given an adverse consequences to the economy, society and environment. In the best interest of the end users and other parties involved in the contract, the
Doraisamy, Sanitha V.
core  

Home - About - Disclaimer - Privacy