Results 41 to 50 of about 10,154 (312)
Hybrid flow shop (HFS) environments are prevalent in various industries, including glass, steel, paper, and textiles, posing complex scheduling challenges. This paper introduces a novel approach employing Variable Neighborhood Search (VNS) to address the
Filip Vidojević +3 more
semanticscholar +1 more source
MODEL PENJADWALAN BACKWARD HYBRID FLOW SHOP 2 STAGE UNTUK MEMINIMASI MEAN FLOWTIME
The scheduling problem is a common challenge when it comes to executing tasks, making the resolution of this issue crucial for decision-making in production activities.
Asep Anwar +2 more
doaj +1 more source
For the green hybrid flow shop scheduling problem considering sequence dependent setup times (SDST) and transportation times, a mixed integer programming model is established with the objectives of minimizing the maximum completion time (makespan) and ...
Shaoxing Wu, Li Liu
semanticscholar +1 more source
This study presents novel anti‐counterfeiting tags with multilevel security features that utilize additional disguise features. They combine luminescent nanosized Ln‐MOFs with conductive polymers to multifunctional mixed‐matrix membranes and powder composites. The materials exhibit visible/NIR emission and matrix‐based conductivity even as black bodies.
Moritz Maxeiner +9 more
wiley +1 more source
This paper deals with no-idle flow shop scheduling problem with the objective of minimizing makespan. A new hybrid metaheuristic is proposed for the scheduling problem solution.
Marcelo Seido Nagano +1 more
doaj +1 more source
A Hybrid Metaheuristic Algorithm for Robust Two-stage Flexible Flow Shop scheduling with Dedicated Assembly Lines under Uncertainty [PDF]
In this paper, the problem of scheduling and sequencing of multi-objective two-stage flexible flow shop with dedicated assembly lines, which produce various products during multiple planning periods, is proposed.
Ali akbar Hasani
doaj +1 more source
Assembly shop scheduling and energy-efficient scheduling have attracted much attention in the past decades; however, energy consumption is often ignored in assembly hybrid flow shop scheduling.
Yandi Zuo, Pan Wang, Ming Li
doaj +1 more source
Consideration of upstream congestion caused by busy downstream machinery, as well as transportation time between different production stages, is critical for improving production efficiency and reducing energy consumption in process industries.
Ke Xu, C. Ye, Hua Gong, Wenjuan Sun
semanticscholar +1 more source
Cu‐based catalysts as a cornerstone in advancing sustainable energy technologies are fully reviewed in this manuscript, highlighting their potential in photo‐ and electrocatalysis. It includes metallic copper, copper oxides, copper sulfides, copper halide perovskites, copper‐based metal–organic frameworks (MOFs), and covalent organic frameworks (COFs),
Jéssica C. de Almeida +16 more
wiley +1 more source
Hybrid Genetic and Spotted Hyena Optimizer for Flow Shop Scheduling Problem
This paper presents a new hybrid algorithm that combines genetic algorithms (GAs) and the optimizing spotted hyena algorithm (SHOA) to solve the production shop scheduling problem.
Toufik Mzili +3 more
doaj +1 more source

