Results 91 to 100 of about 61,466 (272)

Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

open access: yesE3S Web of Conferences, 2018
A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired ...
Che Munaaim M.A.   +4 more
doaj   +1 more source

Preliminary Study on Unit Commitment for Renewable Energy Integration Considering Operation Cost and Life Cycle Assessment

open access: yesIEEJ Transactions on Electrical and Electronic Engineering, EarlyView.
Most countries, including Japan, are focused on achieving net‐zero greenhouse gas (GHG) emissions by 2050, which requires quick action. Despite the increasing level of renewable power generation in power grids, fossil fuel power plants still have a significant role in producing GHG emissions, causing serious environmental issues.
Kadyrbek Kozhobekov   +4 more
wiley   +1 more source

Adaptation of historical technical facility on the small hydroelectric power [PDF]

open access: yes, 2012
V bakalářské práci je popsána historie vodních strojů a jejich využívání na území současné České republiky. Práce se dále dotýká obecné problematiky obnovitelných zdrojů energie především vodních elektráren.
Pavlíček, Jan
core  

Reliability assessment of quick closing valves in hydroeletric power plant [PDF]

open access: yes, 2016
The assessment of existing components of power producing facilities is based on probabilistic methods of the theory of reliability provided in Eurocodes and ISO standards.
Jung, Karel, Marková, Jana
core   +1 more source

Impact of Technological Innovation, Environmental Policy, and Policy Inclusion on Renewable Energy Adoption in Sub‐Sahara Africa

open access: yesThunderbird International Business Review, EarlyView.
ABSTRACT This study investigates the factors influencing renewable energy consumption and renewable electricity in Sub‐Sahara Africa (SSA) using the Lewbel 2SLS approach, panel quantile regression and Driscoll and Kraay estimator. It focuses on a panel dataset covering 41 countries from 1998 to 2020.
Emmanuel K. Manu, Simplice A. Asongu
wiley   +1 more source

Military-Technical and Economic Importance of the Upper Volga Hydroelectric Power Plants During the Great Patriotic War

open access: yesВестник Волгоградского государственного университета. Серия 4. История, регионоведение, международные отношения
Introduction. The article deals with the work of the Upper Volga hydroelectric power plants during the Great Patriotic War, when they were almost the only sources of power supply to Moscow and the Moscow region.
Evgeny Burdin
doaj   +1 more source

The birth of an earth being: ‘Rights of nature’ in Brazilian Amazonia and elsewhere Naissance d'un être de la terre : « droits de la nature » en Amazonie brésilienne et ailleurs

open access: yesJournal of the Royal Anthropological Institute, EarlyView.
In June 2023, the Laje River, located in the traditional territory of the Wari’ Indigenous people in Rondônia, Brazil, was declared a legal entity, an earth being, with rights, following the co‐ordinated action of an indigenous councillor and non‐indigenous activists.
Aparecida Vilaça
wiley   +1 more source

Comparison of The Output Power of a Micro Hydroelectric Power Plant with Different PID Control Structures

open access: yesDüzce Üniversitesi Bilim ve Teknoloji Dergisi
In this study, a micro-hydroelectric power plant that produces energy from the water taken from the Ulutan Dam and sends it to the treatment plant for drinking water purposes was examined.
Tuğba Aydın Kart   +3 more
doaj   +1 more source

Estimation of an Effective Young’s Modulus of Elasticity in the Locality of the Gabčíkovo Hydrology Power Plant by Geometric Leveling

open access: yesSlovak Journal of Civil Engineering, 2015
The Gabčíkovo hydroelectric power plant is located in a complicated geological environment (gravel sub-soil and a high groundwater level). Excavation work started after the withdrawal of water in the autumn of 1984 and lasted until the autumn of 1986.
Mojzeš Marcel   +2 more
doaj   +1 more source

Home - About - Disclaimer - Privacy