Chivor hydroelectric power plant. Colombia

open access: yesInformes de la Construccion, 1977
Con el proyecto de Chivor comenzó la construcción de la Central Hidroeléctrica más grande de Colombia. Esta central, situada a 160 km al noroeste de Bogotá, sobre el río Bata, en el Departamento de Boyacá, cerca de Santa María, tendrá una capacidad de 1.000.000 de kilovatios y su desarrollo se hará en dos etapas de 500.000 kW de capacidad cada una.
openaire   +1 more source

Monitoring performance of hydroelectric power plants

open access: yes, 2013
This study develops a methodology to provide insights regarding the efficiency and productivity of the hydroelectric power plants of an European player in the energy sector throughout the operation stage. DEA is used to measure the efficiency of utilities in generating electrical energy from the resources available and exogenous variables.
Vaz, Clara B., Ferreira, Ângela P.
openaire   +1 more source

Demonstration of an instream flow model to accommodate a threatened tiger beetle in riverine dune habitat

open access: yesInsect Conservation and Diversity, EarlyView.
Burrows of the threatened Gibson's Big Sand Tiger Beetle in riverine dune habitats are susceptible to flooding through managed flows. HEC‐RAS modelling identified the flow thresholds above which flooding would occur for burrows and affect the beetle larvae. These findings provide instream flow guidelines for conserving this threatened species and guide
Iain D. Phillips   +2 more
wiley   +1 more source

Linking rivers, mixing faunas: How artificial connectivity between the Middle and Upper Paraná River basins shapes fish diversity in a tributary of the Itaipu Reservoir, Brazil

open access: yesJournal of Fish Biology, EarlyView.
Abstract This work aimed to investigate the distribution and occurrence of fish species along the São Francisco Falso Braço Norte (SFFBN) River basin, a tributary of the Middle Paraná River basin now artificially connected to the Upper Paraná ecoregion, to evaluate how such connectivity may affect the biogeographic distribution and regional composition
Lucas E. P. Kampfert   +5 more
wiley   +1 more source

Installation and Management of Regulation Systems of a Hydroelectric Power Plant with Doubly Fed Induction Generator and Results of a Case Study

open access: yesEnergies
Climate change has had an impact on the reduction in river flows in many places, affecting the hydroelectric production of several power plants, and this, together with the reduction in the economic retribution for this type of generation in several ...
Francisco Javier Balbás   +2 more
doaj   +1 more source

Research Summary No. 73 [PDF]

open access: yes, 2012
This publication is mostly about electricity in Alaska: how it’s generated, how much fuel is used to produce it, how fuel sources have shifted over time, and how prices vary.
Fay, Ginny   +1 more
core  

A fractal pattern of hierarchical genetic population structure in mixed stocks across fish segregated by dams revealed by genomic resources for curimba Prochilodus lineatus

open access: yesJournal of Fish Biology, EarlyView.
Abstract Genomic resources, new microsatellite markers and a novel observation of a fractal pattern in the genetic population structure are presented for curimba, Prochilodus lineatus, a freshwater migratory model species of South America. Our main goals were to investigate the presence of mixed fish stocks and the effects of damming‐induced ...
Gabriel M. Yazbeck   +5 more
wiley   +1 more source

Deciphering the complex life cycle and partial migration of an ecological engineer and critical Neotropical fishery species, Prochilodus costatus

open access: yesJournal of Fish Biology, EarlyView.
Abstract Understanding complex migration patterns, including drivers of partial migration and habitat use, is challenging but essential for conservation, as it determines a species' adaptative capacity in the face of environmental change and anthropogenic threats.
Alexandre Peressin   +6 more
wiley   +1 more source

ESSO — Electrification of the Central Labe Districts between 1916 and 1950

open access: yesActa Polytechnica, 2012
Elektrárenský svaz stredolabských okresu, LLC (in English “The Power Plant Union of the Central Labe (Elbe)” districts, which will be referred to here as “ESSO”), came into existence in 1916 in response to growing interest in electrification of the ...
Jan Holovský
doaj  

The Latin American and Caribbean Energy Review 2003 [PDF]

open access: yes
The 2003 Energy review,contains information about the 2003 energy situation of each of our member countries, regional data, as well as economic and social indicators corrected and extended through historical series.
Alejandro Villarreal   +4 more
core  