Results 231 to 240 of about 5,052 (277)
Integrated neural network and metaheuristic algorithms for balancing electrical performance and thermal safety in PEMFC design. [PDF]
Ali NB +7 more
europepmc +1 more source
Research frontiers in using biochar for heavy metal remediation. Abstract Heavy metal contamination of water has long been a serious environmental issue. Biochar and biocharābased composites are emerging as effective and sustainable solutions for heavy metal removal due to their strong adsorption abilities and environmentally friendly nature.
Soumik Chakma +4 more
wiley +1 more source
Population interaction network in representative gravitational search algorithms: Logistic distribution leads to worse performance. [PDF]
Li H +6 more
europepmc +1 more source
Evaluation and driving factors of ecological environment quality in the Tarim River basin based on remote sensing ecological index. [PDF]
Tang C +5 more
europepmc +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
Multistage stochastic hydrothermal scheduling
2008 IEEE International Conference on Electro/Information Technology, 2008The paper addresses the stochastic long-term hydrothermal scheduling problem. This problem is usually modeled as a multistage stochastic program and solved using algorithms that are based on dynamic programming. One such algorithm is the stochastic dual dynamic programming (SDDP) algorithm, which is implemented for the hydrothermal power system of the ...
Tarik Aouam, null Zuwei Yu
openaire +1 more source
GENCO's Risk-Constrained Hydrothermal Scheduling
IEEE Transactions on Power Systems, 2008This paper presents a stochastic midterm risk-constrained hydrothermal scheduling algorithm in a generation company (GENCO). The objective of a GENCO is to maximize payoffs and minimize financial risks when scheduling its midterm generation of thermal, cascaded hydro, and pumped-storage units. The proposed schedule will be used by the GENCO for bidding
Lei Wu, Mohammad Shahidehpour, Zuyi Li
openaire +1 more source
Hydrothermal Economic Scheduling
IEEE Transactions on Power Apparatus and Systems, 1963The theory of monotonic scheduling is extended to hydrothermal systems with interconnections to adjoining power systems. The exposition is limited to the two most common types of interconnection arrangements, although the methods can be applied to other cases as well.
B. Bernholtz, L. Graham
openaire +1 more source
An Efficient Hydrothermal Scheduling Algorithm
IEEE Power Engineering Review, 1987In this paper a Hydrothermal Scheduling Algorithm (HSA) for deterministic inflows is presented. A nonlinear network flow model representing the hydrothermal scheduling problem is used. By exploiting the special network structure, a temporally expanded arborescence [1], the HSA code attains important computational savings in processing time and memory ...
M. F. Carvalho, S. Soares
openaire +1 more source
Optimal scheduling of hydrothermal systems
Proceedings of the Institution of Electrical Engineers, 1972The paper describes new algorithms based on 1st-order-gradient techniques for long-term and short-term scheduling of multistorage hydroelectric and multithermal systems for minimum operational cost, with system variables in discrete form, and water inflows and load demands as deterministic. Constraints on various para meters are duly taken into account.
S.K. Agarwal, I.J. Nagrath
openaire +1 more source

