Results 241 to 250 of about 1,027,546 (279)
Some of the next articles are maybe not open access.
Lagen Bridge Cables Installation and Tensioning
IABSE Congress Reports, 2016<p>The Lagen Bridge is the first application of prefabricated HDPE sheathed full locked coil cable stays on a Norwegian bridge. The structure is located in Kvam, about 100 km North from Lillehammer, and it is part of the development project of route E6 between Biri and Otta.
Silvia Geyer +2 more
openaire +1 more source
Parafoudres basse tension - Description. Installation
Réseaux électriques et applications, 2003Cet article presente les criteres de choix et les regles d'installation des parafoudres basse tension. Il doit etre lu en conjonction avec la premiere partie qui traite des composants de parafoudres et des reseaux. Il faut prendre en compte les fonctions secondaires, telles que l'indicateur de defaut ou le renvoi d’etat a distance, mais il ne faut pas ...
openaire +1 more source
Critical Aspects to the Design and Installation of Top Tensioned Risers
Volume 3: Pipeline and Riser Technology; CFD and VIV, 2007Dual and single casing top tensioned risers are widely used by operators for deepwater floating production facility developments. These riser types provide direct vertical access for completions and workover. These single and dual barrier risers are a stable riser concept utilizing the effective tension distribution between casings and tubing to ...
Andy Westlake, Ronan Quinn
openaire +1 more source
Design and Installation of Zero-Tension Lysimeters in an Inclined Cover
Unsaturated Soils 2006, 2006The infiltration component of the water budget in a soil cover layer is difficult to measure under field conditions. Often, zero-tension (or pan) lysimeters are used for that purpose. Although they are relatively cheap and easy to build, as well as easy to install, their design may be more complex than one thinks.
S.-É. Parent +3 more
openaire +1 more source
Irregularity detection on low tension electric installations by neural network ensembles
2009 International Joint Conference on Neural Networks, 2009The volume of energy loss that Brazilian electric utilities have to deal with has been ever increasing. The electricity concessionaries are suffering significant and increasing loss in the last years, due to theft, measurement errors and many other kinds of irregularities. Therefore, there is a great concern from those companies to identify the profile
Cyro Muniz +4 more
openaire +1 more source
Transmission Error in Synchronous Belt With Resonance Under Installation Tension
Journal of Mechanical Design, 2011Synchronous belt drives generate resonance on the belt spans between the driving and driven pulleys when the transverse natural frequency of the belt, matches the meshing frequency of the belt tooth and the pulley tooth. The resonance of the belt spans affects the accuracy of rotation transmission.
Masanori Kagotani, Hiroyuki Ueda
openaire +1 more source
A Method for Installing Zero-Tension Pan and Wick Lysimeters in Soil
Applied Engineering in Agriculture, 2011Zero-tension pan lysimeters and passive capillary fiberglass wick lysimeters are useful in determining water quality and volumetric aspects of subsurface water flow. A crucial aspect of installing pan and wick lysimeters beneath undisturbed soil is preventing cave-in of the tunnels in the soil that house the lysimeters.
null T. R. Way +2 more
openaire +1 more source
Optimization of Tension Level and Stinger Length for Offshore Pipe line Installation
Offshore Technology Conference, 1973ABSTRACT Offshore pipelines have been installed for a period of' some 10 to 20 years using a variety of methods. This paper presents a new analysis method for the optimization of certain operation parameters in laying continuous pipe under tension from a barge. This method of optimization is now being used by one of
openaire +1 more source
Analysis of the Influence of TLP Installation Error on Tendon Tension
Volume 7A: Ocean Renewable EnergyAbstract Tension Leg Platform (TLP) supported floating wind turbine (TLP-FOWT) has drawn more attention recently due to their better hydrodynamic properties than widely used semi-submersible platform. However, TLP-FOWTs are sensitive to tendon pretension.
Jinghui Li +4 more
openaire +1 more source
Llyn Alaw reservoir post-tensioned anchor installation
Dams and Reservoirs, 2013As a result of leakage along the downstream face of the dam, a section 10 inspection carried out in February 2006 contained a recommendation for a study to be undertaken into the uplift pressures and stability of the concrete gravity dam impounding Llyn Alaw reservoir.
openaire +1 more source

