Results 211 to 220 of about 44,724 (245)
Some of the next articles are maybe not open access.

Integrated Production Schedule

SPE Caspian Technical Conference and Exhibition, 2023
Abstract The focus of this comprehensive study is the mitigation and prevention of incidents that may lead to potential production loss (LPO) at the Tengiz and Korolev fields, two vital components of the oil and gas industry. These fields confront numerous challenges in production and ongoing operational activities. The primary objective
Aibek Urazov, Iliyas Zholshybekuly
openaire   +1 more source

Integrated airline scheduling

Computers & Operations Research, 2009
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
openaire   +1 more source

Integrating scheduled hydroponic system

2016 IEEE International Conference on Advances in Computer Applications (ICACA), 2016
Cultivation, adding up to an important aspect in GDP (Gross Domestic Produce), has been affected tremendously over the past few decades due to the use of chemicals. Due to rapid urbanization and industrialization, arable land under cultivation is decreasing enormously.
S. Umamaheswari   +3 more
openaire   +1 more source

CBM Integrated Maintenance Scheduler

Volume 7: Education; Industrial and Cogeneration; Marine; Oil and Gas Applications, 2008
Condition Based Maintenance (CBM) is a key technology enabling facility maintenance cost reduction. The CBM approach to maintenance replaces rigid time-based maintenance schedules with the “right maintenance at the right time” identified by real-time equipment health monitoring.
Simon Jessop   +2 more
openaire   +1 more source

Computer Integrated Production Scheduling

1996
Within all activities of production management, production scheduling is a major part covering planning and control functions. By production management we mean all activities which are necessary to carry out production. The two main decisions to be taken in this field are production planning and production control.
Jacek Błażewicz   +4 more
openaire   +1 more source

Integrated resource scheduling in a distributed scheduling environment

Telematics and Informatics, 1988
The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA.
David Zoch, Gardiner Hall
openaire   +1 more source

INTEGRATED MASTER PLAN / INTEGRATED MASTER SCHEDULE

INCOSE International Symposium, 1993
AbstractThe Advanced Tactical Fighter (ATF) Engineering and Manufacturing Development (EMD) Request For Proposals called for several dramatic changes in the acquisition process along the guidelines proposed by the Packard Commission. The ATF EMD Program was to truly be an event‐based program, as opposed to being driven predominantly by a schedule ...
openaire   +1 more source

Integrated Airline Schedule Planning

1998
A flight schedule defines a feasible plan of what cities to fly to and at what times. The task of airline schedule planning is to generate a flight schedule that achieves the most effective use of an airline’s resources. Typically, schedule planning is a sequential process. First, key decisions are made about the flight schedule and then, decisions are
Cynthia Barnhart, Fang Lu, Rajesh Shenoi
openaire   +1 more source

Schedulability Test of Partition Scheduling for Integrated Modular Avionics

2010 International Conference on Computational Intelligence and Software Engineering, 2010
Integrated modular avionics (IMA) is widely adopted by avionics industry to achieve substantial cost reduction in the development, operation and maintenance of airplanes. To meet recommended real-time and fault-tolerance requirements of IMA software architecture, the operating system (OS) should support spatial and temporal partitioning in order to ...
Ming Wan   +3 more
openaire   +1 more source

Home - About - Disclaimer - Privacy