Results 281 to 290 of about 63,403 (312)
Some of the next articles are maybe not open access.
Integrated Sequencing and Scheduling in Coil Coating
Management Science, 2011We consider a complex planning problem in integrated steel production. A sequence of coils of sheet metal needs to be color coated in consecutive stages. Different coil geometries and changes of colors necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks.
Wiebke Höhn +3 more
openaire +1 more source
An Integrated and Flexible Architecture for Planning and Scheduling
2006In this paper we propose an integrated architecture to cope with real-world problems of planning and scheduling. Our approach consists of two specialised processes, one for planning and one for scheduling, which work together in a strong-coupled manner to deal with complex problems that involve time and resource constraints.
Antonio Garrido Tejero +2 more
openaire +1 more source
Vertical Data Integration for Reactive Scheduling
KI - Künstliche Intelligenz, 2010Within supply chains planning and scheduling tasks are spread across several companies and over several hierarchically levels. But the main scheduling direction is top down which means that reactive scheduling in the case of disturbing events is not supported on all scheduling levels of the supply chain.
openaire +1 more source
An approach for integrated scheduling and lot-sizing
European Journal of Operational Research, 2006zbMATH Open Web Interface contents unavailable due to conflicting licenses.
openaire +2 more sources
Dynamic scheduling method for integrated process planning and scheduling problem with machine fault
Robotics and Computer-Integrated Manufacturing, 2022Xiaoyu Wen, Haoqi Wang, Hao Li
exaly
Integrated Schedule Optimisation
2012Most successful contemporary major mining businesses today focus on developing strategic, long-term development plans that maximise the value or Net Present Value (NPV) of their operations. Scheduling of the available geological reserves commonly relies on one of the several techniques available to optimise the cut-off grade in the NPV maximisation ...
openaire +1 more source
Integrated Scheduling of Production and Distribution Operations
Management Science, 2005Zhi-Long Chen, George Vairaktarakis
exaly
Reducing carbon emission of pickup and delivery using integrated scheduling
Transportation Research, Part D: Transport and Environment, 2016Jiafu Tang, Junwei Wang
exaly

