Results 41 to 50 of about 63,403 (312)
Scheduling uncertain orders in the customer–subcontractor context [PDF]
Within the customer–subcontractor negotiation process, the first problem of the subcontractor is to provide the customer with a reliable order lead-time although his workload is partially uncertain.
Grabot, Bernard +2 more
core +1 more source
The U-shaped automated container terminal (U-ACT) meets the requirements of sea-rail intermodal transportation with its unique layout. However, this layout also presents challenges, such as complex container transshipment planning and challenging ...
Zeyi Liu, Junjun Li
doaj +1 more source
Aiming at the problems of wind and photovoltaic power curtailment and total electrical load fluctuation caused by high permeability renewable energy and electric buses access to the system, a two-stage optimal scheduling method of regional integrated ...
Zichun YU, Hong FAN, Shiwei XIA
doaj +1 more source
On electrical load tracking scheduling for a steel plant [PDF]
Nolde and Morari (2010) study a steel manufacturing scheduling problem where the tasks must be scheduled such that electricity consumption matches to a pre-specified periodic energy chart.
Artigues, Christian +3 more
core +1 more source
Intelligent Guided Vehicles (IGVs) in U-shaped automated container terminals (ACTs) have longer travel paths than those in conventional vertical layout ACTs, and their interactions with double trolley quay cranes (DTQCs) and double cantilever rail cranes
Qinglei Zhang +6 more
doaj +1 more source
Model predictive control is one of the key technologies to realize the multi-time scale optimal scheduling of integrated energy system. However, the traditional centralized model predictive control has the high model order, a large amount of online ...
Keyong Hu +4 more
doaj +1 more source
This study explores the integrated scheduling optimization of coal port operations, addressing the dual challenges of handling efficiency and resource conservation by coordinating equipment scheduling with stockyard spraying operations.
Yidi Wu +4 more
doaj +1 more source
At present, Multi-Devices-Process Integrated Scheduling Algorithm with Time-Selective Strategy for Process Sequence (MISATPS) is an advanced algorithm in the field of integrated scheduling with multi-devices-process problems.
Zhen Wang +3 more
doaj +1 more source
With the rapid development of global trade, the cargo throughput of automated container terminals (ACTs) has increased significantly. To meet the demands of large-scale, high-intensity, and high-efficiency ACT operations, the seamless integration of ...
Shuaishuai Gong +4 more
doaj +1 more source
ABSTRACT Primary lung carcinomas and bronchial carcinoid tumors (BC) are very rare malignancies in childhood. While typical BC and mucoepidermoid carcinomas are mostly low‐grade, localized tumors with a more favorable prognosis than in adults, necessitating avoidance of overtreatment, adenocarcinomas of the lung are often diagnosed at advanced disease ...
Michael Abele +19 more
wiley +1 more source

