Results 101 to 110 of about 222,613 (309)

Economic analysis method for park-level source-grid-load-storage integration project under independent investment operation mode

open access: yesZhongguo dianli
Given that the impact of initial investment in energy storage as well as its operational costs and revenues on the overall economic benefits of the integrated project are of vital importance, this paper proposes an investment benefit analysis method in ...
Danman WU   +3 more
doaj   +1 more source

3D Printed Photon Shield Assembly for Low‐Noise Visual Stimulation During Two‐Photon Imaging in Mice

open access: yesAdvanced Materials Technologies, EarlyView.
We present the Photon Shield, an open‐hardware system for low‐noise two‐photon calcium imaging during visual stimulation in mice. Combining a 3D‐printed headplate and rail‐mounted shield substantially reduces stray‐light contamination, as quantitatively verified. Functional validation confirms reliable cortical responses. Open design files enable broad
Gergely Katona   +6 more
wiley   +1 more source

Irreversibility, Uncertainty, and Cyclical Investment [PDF]

open access: yes
The optimal timing of real investment is studied under the assumptions that investment is irreversible and that new information about returns is arriving over time. Investment should be undertaken in this case only when the costs of deferring the project
Ben S. Bernanke
core  

Analysis and Evaluation of the Investment Project in the Company

open access: yes, 2016
Předmětem diplomové práce Analýza a zhodnocení investičního projektu ve firmě je analýza a zhodnocení efektivity již zrealizované investice do strojního zařízení.
Chludová, Nikol
core   +1 more source

Multi-scenario investment forecast of new energy projects based on multiple linear regression and comprehensive evaluation model of differentiated project priorities

open access: yesHeliyon
As China's resource shortage and environmental pollution intensify, the demand for new energy and electric energy substitution is becoming higher and higher.
Guang Tian   +5 more
doaj   +1 more source

Unlocking Terahertz Steganography: Authentication of Hidden Images in Flexible Media

open access: yesAdvanced Materials Technologies, EarlyView.
Hidden information in multilayered devices, such as steganographic portraits, is detected and authenticated using reflection‐mode terahertz time‐domain imaging. Image reconstruction relies on a dedicated figure‐of‐merit obtained by integrating the signal intensity over the time‐window associated with the reflection from the metallic mirror backing the ...
Tiziana Ritacco   +4 more
wiley   +1 more source

The effects of costly exploration on optimal investment timing [PDF]

open access: yes
This paper investigates a principal-agent model in which an owner (principal) optimizes a contract with a manager (agent) delegated to undertake an investment project. In the model, we explore the effects of costly exploration by which the manager learns
Michi NISHIHARA, Takashi SHIBATA
core  

Practical Aspects of Investment Projects Analysis

open access: yesتحقیقات مالی, 1996
In the competitive world of today, the manufacturers may not be able to survive unless diversify the products. Producing new products involves further investment and accordingly, applying the options. Manufacturers make investments In strategic and devepmental projects, or replace equipments. Scarcity of resources and rare opportunities entail applying
openaire   +1 more source

Large‐Area Flat Optics Color Routing in Tilted Arrays of 2D Semiconductor Nanostripes

open access: yesAdvanced Optical Materials, EarlyView.
We develop a scalable flat optics platform exploiting self‐organised ion‐beam sputtering and maskless glancing‐angle deposition to fabricate centimetre‐scale arrays of tilted MoS2 nanostripes. The engineered geometry activates Rayleigh anomalies, guided modes, and Mie resonances, enabling highly directional color routing and enhanced light harvesting ...
Simone Di Marco   +7 more
wiley   +1 more source

A real options approach to project management. [PDF]

open access: yes
When scheduling an uncertain project, project management may wait for additional (future) information to serve as the basis for rescheduling the project.
Boute, Robert   +2 more
core  

Home - About - Disclaimer - Privacy