Results 171 to 180 of about 729,097 (348)
Workflow of the parameter optimization process for ITSC fault detection, applying Differential Evolution optimization and the Smooth Pseudo Wigner‐Ville Distribution for signal processing. The optimized parameters are then used in the failure identification pipeline, which combines the signal processing with a YOLO‐based architecture for fault severity
Rafael Martini Silva +4 more
wiley +1 more source
Combining Neighbourhoods in Fuzzy Job Shop Problems
Jorge Puente +2 more
openalex +2 more sources
A Hybrid Bacterial Foraging Algorithm For Solving Job Shop Scheduling Problems
S Narendhar., T Amudha.
openalex +1 more source
Data‐Driven Distributed Safe Control Design for Multi‐Agent Systems
This paper presents a data‐driven control barrier function (CBF) technique for ensuring safe control of multi‐agent systems (MASs) with uncertain linear dynamics. A data‐driven quadratic programming (QP) optimization is first developed for CBF‐based safe control of single‐agent systems using a nonlinear controller. This approach is then extended to the
Marjan Khaledi, Bahare Kiumarsi
wiley +1 more source
Multi-Objective Scheduling Simulation of Adaptive Job Shop based on Modified SOMA Algorithm [PDF]
Danding Jiang +3 more
openalex +1 more source
Enhanced memetic search for reducing energy consumption in fuzzy flexible job shops
Pablo García Gómez +2 more
openalex +2 more sources
Infrared (IR) light evokes distinct calcium and water transport responses in astrocytes, depending on stimulation duration and protocol. This study uses widefield imaging and pharmacology to reveal differential engagement of astroglial signaling pathways.
Wilson R. Adams +7 more
wiley +1 more source
PENJADWALAN 20 JOB 8 MESIN DENGAN METODE GENETIC ALGORITHM (GA)
Penelitian ini merupakan perluasan dari penelitian sebelumnya yang dilakukan oleh Iskandar (2013) dengan judul “IMPLEMENTASI PENJADWALAN MESIN JOB SHOP DENGAN METODE HEURISTIC DISPATCHING RULES DI CV BOEING TEKNIK MANDIRI”.
Didit Damur Rochman, Rendiyatna Ferdian
doaj
A novel two stage neighborhood search for flexible job shop scheduling problem considering reconfigurable machine tools [PDF]
Yanjun Shi, Chee Fen Yu, Shiduo Ning
openalex +1 more source

