Results 21 to 30 of about 737,186 (350)

Active Shop Scheduling Of Production Process Based On RFID Technology

open access: yesMATEC Web of Conferences, 2016
In industry 4.0 environment, intelligent technology is almost applied to all parts of the manufacturing process, such as process design, job shop scheduling, etc.. This paper presents an efficient approach to job shop scheduling actively by using RFID to
Cuihua Chao   +3 more
doaj   +1 more source

Proposta de classificação hierarquizada dos modelos de solução para o problema de job shop scheduling A proposition of hierarchical classification for solution models in the job shop scheduling problem

open access: yesGestão & Produção, 1999
Este artigo propõe uma classificação hierarquizada dos modelos utilizados na solução do problema de programação da produção intermitente do tipo job shop, incluindo tanto os que fornecem solução ótima, quanto os modelos heurísticos mais recentes baseados
Ricardo Ferrari Pacheco   +1 more
doaj   +1 more source

Developing Multistage Heuristic Algorithm To Minimize Idle Time And Makespan In Job Shop Scheduling [PDF]

open access: yesEngineering and Technology Journal, 2010
The behavior and performance of job shops have been the focus andattention in both operations research and operations management literature. Job shop scheduling has received this large amount of attention, because it has the potential to dramatically ...
Mahmoud Abbas Mahmoud
doaj   +1 more source

Job-shop scheduling with limited capacity buffers [PDF]

open access: yes, 2006
In this paper we investigate job-shop problems where limited capacity buffers to store jobs in non-processing periods are present. In such a problem setting, after finishing processing on a machine, a job either directly has to be processed on the ...
Brucker, Peter   +3 more
core   +3 more sources

An Improved Elephant Herding Optimization for Energy-Saving Assembly Job Shop Scheduling Problem with Transportation Times

open access: yesAxioms, 2022
The energy-saving scheduling problem (ESSP) has gained increasing attention of researchers in the manufacturing field. However, there is a lack of studies on ESSPs in the assembly job shop environment.
Tianhua Jiang   +3 more
doaj   +1 more source

An investigation into minimising total energy consumption and total completion time in a flexible job shop for recycling carbon fiber reinforced polymer [PDF]

open access: yes, 2015
The increased use of carbon fiber reinforced polymer (CFRP) in industry coupled with European Union restrictions on landfill disposal has resulted in a need to develop relevant recycling technologies.
Liu, Ying, Tiwari, Ashutosh
core   +1 more source

Pull-Based Output Rate Control of a Flexible Job Shop in a Multi-Shop Production Chain

open access: yesMathematics
This paper addresses the problem where optimizing a single production shop within a production chain may not improve the overall performance of the entire chain.
Wei Weng, Meimei Zheng, Jiuchun Ren
doaj   +1 more source

Application of an evolutionary algorithm-based ensemble model to job-shop scheduling [PDF]

open access: yes, 2019
In this paper, a novel evolutionary algorithm is applied to tackle job-shop scheduling tasks in manufacturing environments. Specifically, a modified micro genetic algorithm (MmGA) is used as the building block to formulate an ensemble model to undertake ...
Hanoun, Samer   +7 more
core   +1 more source

Improved genetic algorithm for job shop scheduling

open access: yesJournal of Hebei University of Science and Technology, 2019
In order to obtain the optimal solution of genetic algorithm for job shop scheduling problem and improve the iteration speed of the algorithm, the improved method of genetic algorithm is studied.
Xianpeng ZHENG, Lei WANG
doaj   +1 more source

Semi-autonomous Intersection Collision Avoidance through Job-shop Scheduling [PDF]

open access: yes, 2015
In this paper, we design a supervisor to prevent vehicle collisions at intersections. An intersection is modeled as an area containing multiple conflict points where vehicle paths cross in the future. At every time step, the supervisor determines whether
Bussieck M. R.   +6 more
core   +2 more sources

Home - About - Disclaimer - Privacy