Dynamic Data Scheduling of a Flexible Industrial Job Shop Based on Digital Twin Technology
Aiming at the problems of premature convergence of existing workshop dynamic data scheduling methods and the decline in product output, a flexible industrial job shop dynamic data scheduling method based on digital twin technology is proposed.
Juan Li, Xianghong Tian, Jing Liu
doaj +1 more source
An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling Problem
The flexible job shop scheduling problem is a well-known combinatorial optimization problem. This paper proposes an improved shuffled frog-leaping algorithm to solve the flexible job shop scheduling problem. The algorithm possesses an adjustment sequence
Kong Lu +5 more
doaj +1 more source
Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach [PDF]
In this paper, we consider job shop scheduling and machine location problem, simultaneously. Processing, transportation, and setup times are defined as deterministic parameters.
Mostafa Kazemi +2 more
doaj
Purpose: This research develops a batch scheduling model for a three-stage flow shop with job processors in the first and second stages and a batch processor in the third stage.
Pratya Poeri Suryadhini +3 more
doaj +1 more source
Este artigo propõe uma classificação hierarquizada dos modelos utilizados na solução do problema de programação da produção intermitente do tipo job shop, incluindo tanto os que fornecem solução ótima, quanto os modelos heurísticos mais recentes baseados
Ricardo Ferrari Pacheco +1 more
doaj +1 more source
Job Shop Scheduling Under Uncertainty
In this research we aim to investigate the job shop scheduling problem with uncertain processing times. First we study the literature for the best solution approaches for the deterministic job shop problem. Among all developed algorithms in the literature the famous TSAB algorithm by Nowicki and Smutnicki in 1996 has shown well performance regarding ...
Ghorbani Saber, Reza +3 more
openaire +2 more sources
This paper develops job shop production scheduling using Non Delay algorithm through forward and backward-forward algorithm to minimize total earliness and tardiness costs.
Dian Retno Sari Dewi
doaj +1 more source
With the popularization of multi-variety and small-batch production patterns, the flexible job shop scheduling problem (FJSSP) has been widely studied. The sharing of processing resources by multiple machines frequently occurs due to space constraints in
Zhen Chen +3 more
doaj +1 more source
Intelligent production is an important development direction in intelligent manufacturing, with intelligent factories playing a crucial role in promoting intelligent production.
MA Yajie +5 more
doaj +1 more source
Real-Time Hybrid Flow Shop Scheduling Approach in Smart Manufacturing Environment
Smart manufacturing in the “Industry 4.0” strategy promotes the deep integration of manufacturing and information technologies, which makes the manufacturing system a ubiquitous environment.
Xiuli Wu, Zheng Cao, Shaomin Wu
doaj +1 more source