Results 151 to 160 of about 502 (180)
Some of the next articles are maybe not open access.
Development of Kanban System at Local Manufacturing Company in Malaysia–Case Study
Procedia Engineering, 2012Noriah Yusoff
exaly
A study on the risk management of multi Kanban system in a closed loop supply chain
International Journal of Production Economics, 2012Surendra M Gupta, Kenichi Nakashima
exaly
Kanban supplier system as a standardisation method and WIP reduction
International Journal of Industrial and Systems Engineering, 2012Ahad Ali
exaly
An integrated MOGA approach to determine the Pareto-optimal kanban number and size for a JIT system
Expert Systems With Applications, 2011Tung-Hsu Hou
exaly
Transient behavior of a single-stage kanban system based on the queueing model
International Journal of Production Economics, 1999Yoichi Seki
exaly
Optimal method for changing the number of kanbans in thee-Kanban system and its applications
International Journal of Production Research, 2007exaly

