Results 211 to 219 of about 2,015 (219)
Some of the next articles are maybe not open access.
Operator interface programs for KSTAR operation
Fusion Engineering and Design, 2013Mikyung Park
exaly
Commissioning of vacuum pumping devices of the second KSTAR neutral beam injection system
Fusion Engineering and Design, 2019Hong-Tack Kim, K R Park, Y B Chang
exaly
Status of the KSTAR Tokamak Construction
21st IEEE/NPS Symposium on Fusion Engineering SOFE 05, 2005J. Bak +8 more
openaire +1 more source
Design and CFD analysis of hypervapotron-typed ion dump for KSTAR NBI-2 system
Fusion Engineering and Design, 2018Kyungmin Kim, Y B Chang, H T Kim
exaly
Commissioning and initial operation of KSTAR superconducting tokamak
Fusion Engineering and Design, 2009Yeong-Kook Oh, M L Walker, D P Ivanov
exaly
Improvement of initial vacuum condition along 2008–2010 KSTAR campaign by vessel baking
Fusion Engineering and Design, 2011H L Yang, K R Park, Y O Kim
exaly

