Results 121 to 130 of about 107,641 (143)

PROBLEM PSIKOSOSIAL MAHASISWI KORBAN DATING VIOLENCE (STUDI KASUS DI KOTA MALANG) [PDF]

open access: yes
This research aims to uncover and explore more deeply the cases of dating violence that are rampant among university students in Malang City, East Java. This research focuses on women who experience psychosocial problems in early adulthood as a result of
Ristodiya, Michaella Novenda
core  

Synthesis of Zeolite Y from Lapindo Mud with the Comparative Variation of the Weight of NaOH/Mud and Molar SiO2/Al2O3

open access: yesIndonesian Chimica Letters, 2022
Lapindo mud is a waste that can be used as a zeolite formation material. Zeolite is a mineral there are silica and alumina. The zeolite synthesized was the zeolite Y. The synthesis of zeolite Y is carried out the melting method followed by hydrothermal process.
Novita Andarini   +3 more
openaire   +2 more sources

Bioremediation model of oil-contaminated soil in Lapindo mud using multisymbiotic organism

Management of Environmental Quality: An International Journal, 2020
PurposeThe study aimed at developing the bioremediation model of Lapindo mud through multisymbiotic organism.Design/methodology/approachThe research was conducted using completely randomized design. The model plants chosen in this research were soybean.
Y. Rahayu
openaire   +2 more sources

Hydrothermal Synthesis of Well-Crystallized Boehmite from Lapindo Mud: Process Optimization

International Journal of Chemical and Biochemical Sciences
A well-crystallized form of boehmite was successfully synthesized from alumina derived from Lapindo Mud using hydrothermal methods. A comprehensive evaluation and analysis of the reaction temperature, reaction time, and pH of the hydrothermal system was ...
Didi Dwi Anggoro   +5 more
openaire   +2 more sources

Development Efforts of Coastal Community after Lapindo Mud Flow

Applied Mechanics and Materials, 2017
Lapindo is waste disposal the mud that comes out of the PT. Lapindo Brantas.Inc in Porong, Sidoarjo East Java, which has lasted for more than 9 years ago. With the volume bursts of 105 m3/day and take time to stop bursts estimated at 8907 years. This sludge can affect surrounding communities.
null Alaudin   +2 more
openaire   +1 more source

Home - About - Disclaimer - Privacy