Research on Water-Conducting Fractured Zone Height under the Condition of Large Mining Height in Yushen Mining Area, China [PDF]
Accurately predicting the development height of the water-conducting fracture zone (HW) is imperative for safe mining in coal mines, in addition to the protection of water resources and the environment.
Dong Feng +3 more
doaj +3 more sources
Study on Surrounding Rock Control and Support Stability of Ultra-Large Height Mining Face
Surrounding rock control and support stability in the process of coal seam mining in ultra-large height mining face are the key to normal mine operation.
Sheng Wang, Xuelong Li, Qizhi Qin
doaj +4 more sources
Abutment Pressure Distribution Law and Support Analysis of Super Large Mining Height Face. [PDF]
Under the condition of the shallow coal seam, the laws of roof activity after large mining height longwall face mining and prevention measures for large-area roof weighting are problems that need to be solved urgently. In the background of the super large mining height working face in the upper 108 working face of Jinjitan Coal Mine 12-2, the spatial ...
Zhang L +6 more
europepmc +4 more sources
Floor Disturbance and Failure Characteristics of Super-Large Mining Height Working Face
The failure depth of the working face floor caused by mining is a key parameter to predict water inrush from the working face floor. Extensive research has been conducted on the floor failure zone of the working face. However, in recent years, there have
Cunjin Lu +5 more
doaj +3 more sources
The extensive adoption of large mining height technology and the progressive deepening of mining operations have presented formidable challenges to the safety of roadway support.
Yinghao Qu +7 more
doaj +3 more sources
Influence of joint fissure occurrence on stress distribution of coal wall in large mining height [PDF]
In order to ensure the stability of coal wall of fully mechanized mining face with large mining height, Aiming at the prominent problem that the rib spalling rate of coal wall in fully mechanized mining face with large mining height is high and is ...
Weibin Guo, Yichen Gao, Gang Wang
doaj +5 more sources
Study on roadway deformation and control method under large mining height conditions [PDF]
Focusing on the S1212 working face in Ningtiaota coal mine, this study investigates a soft mold filling wall as a primary support strategy for gob-side entry retention.
Yuxiang Cao +9 more
doaj +3 more sources
Research on key technologies of intelligent large mining height fully mechanized mining equipments
In order to ensure safe and high-efficient operation of intelligent fully mechanized mining equipments and normalized application of intelligent fully mechanized mining technologies, for fully mechanized mining equipments such as shearer, hydraulic ...
ZHANG Yuliang
doaj +2 more sources
Technology Research on the Fourth Panel Mining Large Height Fully-mechanized Caving Mining in Shangwan Coal Mine [PDF]
According to the characteristics of the 1-2 coal seam of Shangwan coal mine 4th panel, this research analyzed the feasibility of sublevel caving hydraulic support in the fully-mechanized mining face through estimation method and numerical simulation ...
Liu Yingjie, Wang Xiaomou
doaj +2 more sources
Trial of small gateroad pillar in top coal caving longwall mining of large mining height
Abstract Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving height was 11.2 m. The gateroad pillar between panels was 38 m.
Huigui Li, Yongxiang Xu, Ruifu Yuan
exaly +2 more sources