Last Planner Control System Applied to a Chemical Plant Construction [PDF]
The main difference between the Last Planner production control system developed by Ballard and classical control systems is the way in which projects are controlled and planned. The Last Planner system focuses on controlling production units, workflows and the quality of the performed work.
Nieto Morote, Ana María +1 more
openaire +4 more sources
Development of Approach to Support Construction Stakeholders in Implementation of the Last Planner System [PDF]
AbstractImplementation of the Last Planner System (LPS) has gained prominence in the construction industry, and its influence on the production system seems to be rapid and significant.
Emmanuel Itodo Daniel +2 more
openaire +5 more sources
Application of Last Planner System to Modular Offshore Wind Construction
AbstractThe focus of this study is the applicability of the Last Planner System (LPS) to modular offshore wind construction.
Jon Lerche +5 more
openaire +3 more sources
THE MAGIC OF THE LAST PLANNER ® SYSTEM FOR NIGERIAN CONSTRUCTION [PDF]
Extremely poor economic performance of the Nigerian construction industry suggests that non-value adding activities are prevalent, which result not only in the reduction of contractors’ profit margin but economic loss for the country in general. This study analyses non-value adding activities in Nigerian construction sites.
Daniel, EI, Pasquire, C, Ameh, OJ
core +6 more sources
The Last Planner System (LPS) is a production planning and control system based on Lean Construction (LC) principles. Effectively implementing the LPS in the construction industry remains challenging, impeding the realization of LC principles. Automation
Ajay Kumar Agrawal +4 more
doaj +3 more sources
Vellykket implementering av Last Planner System
Lean Construction, og spesielt Last Planner System, har blitt foreslått som en løsning for å redusere sløsingen i produksjonsprosesser. Bygg- og anleggsbransjen har gjentatte ganger blitt kritisert for å ha for lav produktivitet. Dersom Last Planner System skal kunne bidra til å øke denne må implementeringen gjøres riktig slik at man får de ønskede ...
Lien, Elisabeth Skogan
openaire +2 more sources
Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects [PDF]
Construction projects face delays and disturbances that could be caused by one of the contracting parties, both of them, or beyond their control. Proving the delay needs a significant effort to introduce all details, documents, and records which explain ...
Adel El-Samadony +2 more
doaj +1 more source
The Combination of Last Planner System and Location-Based Management System
Research Question: The Last Planner System (LPS) and Location-Based Management System (LBMS) both aim to achieve the lean goals of decreasing waste, increasing productivity and decreasing variability. Q1: How to best link these two systems together to achieve better project performance? Q2: can the LBMS control mechanisms be integrated with LPS? Q3:
Seppänen, Olli +2 more
openaire +4 more sources
An examination of the barriers to last planner implementation [PDF]
This paper presents results that contribute to an ongoing PhD work, looking at the implementation of Lean Production in manufacturing and what findings can be derived for the implementation of Lean in construction.
Brady, Denise Ann +2 more
core +3 more sources
Looking for Improvement in the Last Planner System: Defining Selection Criteria [PDF]
Last Planner System has been critiqued for an inconsistent application of flows. Central for this critique was that the sequence of activities was determined based on only duration and interrelationships. In an attempt to improve the on-site scheduling processes, an in-depth analysis of selection criteria was carried out.
Lindhard, Søren +1 more
openaire +1 more source