Results 261 to 270 of about 22,682,546 (270)
Some of the next articles are maybe not open access.
Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques
Journal of Construction Engineering and Management - ASCE, 2019Thais da C L Alves +2 more
exaly
Improving Construction Management Practice With the Last Planner System: A Case Study
Engineering, Construction and Architectural Management, 2014Lauri Koskela
exaly
Is the Last Planner System applicable to design? A case study
2009F.R. Hamzeh, G. Ballard, I.D. Tommelein
openaire +1 more source
Towards Last Planner System Implementation in Gaza Strip, Palestine
International Journal of Construction Management, 2020exaly
Continous Improvement of the Digital Last Planner System Whiteboard
Annual Conference of the International Group for Lean ConstructionErgo Pikas +2 more
openaire +1 more source
Integration of Last Planner System and Location-Based Management System
2015Modrich, Ralf-Uwe +3 more
openaire +2 more sources

