Results 121 to 130 of about 10,030 (224)

LCOE assessment of the PivoBuoy Concept

open access: yes
This key report will summarize the potential impact on LCOE of the innovations developed along the project The final report be issued at the end of the project but periodic reviews will be done since M6 every 6 monthsRefers to task ...
openaire   +1 more source

Machine learning-based long-term degradation and LCOE Analysis of floating PV with custom pontoon design. [PDF]

open access: yesPLoS One
Mohajon R   +7 more
europepmc   +1 more source

LCoE of final configuration

open access: yes
This is part of Task 8.4 and 8.5. The LCoE of the final optimised configurations will be presented in a report, detailing the methodology and assumptions used and the confidence in the obtained LCoE estimates.
openaire   +1 more source

LCOE & Financial Models

open access: yes
Model for the lifetime cost of energy for tidal arrays, supported by a detailed tidal array project financial model. Relates to T3.7.
openaire   +1 more source

Report on the impact of OPTIDRILL on LCOE

open access: yes
This deliverable is part of Task14.2 and will provide report on the LCOE analysis to demonstrate the economic impact of the OptiDrill concept. The report will include the collected technical data such as depth to drill to intersect target formation, temperature of the target formation, ROP, drilling time, tripping time, bit consumed, probable project ...
openaire   +1 more source

Home - About - Disclaimer - Privacy