Improving grain yield prediction in Southern US oat germplasm using genomics information and environmental covariates. [PDF]

open access: yesPlant Genome
Adewale SA   +11 more
europepmc   +1 more source

Logic-based Benders decomposition method for the seru scheduling problem with sequence-dependent setup time and DeJong's learning effect

European Journal of Operational Research, 2021
This paper concentrates on the scheduling problem in seru production system (SPS), where seru is a successful new-type production mode arising from the Japanese labor-intensive electronic assembly industry.
Zhe Zhang   +4 more
semanticscholar   +1 more source

A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect

Expert systems with applications, 2021
The existing papers on unrelated parallel machine scheduling problem with sequence and machine-dependent setup times (UPMSP-SMDST) ignore the worker resources and learning effect.
Like Zhang   +4 more
semanticscholar   +1 more source

An exact solution method for solving seru scheduling problems with past-sequence-dependent setup time and learning effect

Computers & industrial engineering, 2021
This paper concentrates on three scheduling problems with past-sequence-dependent setup time and DeJong's learning effect in seru production system (SPS), including minimizing the total waiting time, the total absolute differences in waiting time, and ...
Yujing Jiang   +3 more
semanticscholar   +1 more source

Permutation flow shop energy-efficient scheduling with a position-based learning effect

International Journal of Production Research, 2021
Severe environmental problems have made green scheduling an emerging research hotspot. In this paper, a permutation flow shop energy-efficient scheduling problem that considers multiple criteria is investigated.
Xu Xin   +4 more
semanticscholar   +1 more source

Effective algorithms for single-machine learning-effect scheduling to minimize completion-time-based criteria with release dates

Expert systems with applications, 2020
Multi-variety and small-batch productions are usually undertaken by skilled workers instead of an automatic assembly line because of economic cost consideration.
Danyu Bai   +5 more
semanticscholar   +1 more source

Information sharing in a closed-loop supply chain with learning effect and technology licensing

, 2020
The considerable economic and environmental benefits from remanufacturing has led growing interest in closed-loop supply chain management. Incorporating information sharing and learning effect plays a significant role in determining the efficiency and ...
Yan-Ting Huang, Zong-Jun Wang
semanticscholar   +1 more source