Results 91 to 100 of about 1,590,872 (130)
Some of the next articles are maybe not open access.
Procedure of Seismic Performance Evaluation of LNG Receiving Terminal Facilities
Tae-Hyung Lee
exaly +3 more sources
BOG Handling Method for Energy Saving in LNG Receiving Terminal
Computer Aided Chemical Engineering, 2011Abstract Generation of Boil-off gas (BOG) in liquefied natural gas (LNG) receiving terminal affects considerably operating energy costs and safety issue. For that reason, the BOG handling method is determinant for design of LNG receiving terminal. This study proposes the concept of new design for BOG handling and calculates the design variables using
Youngsub Lim, Chonghun Han
exaly +2 more sources
Design Considerations for an LNG Receiving Terminal
Proceedings of SPE Annual Technical Conference and Exhibition, 2003Abstract LNG receiving or import terminals are not a new phenomenon, with over 40 in existence worldwide, the oldest being more than 30 years old. At present, there is renewed interest in LNG receiving terminals outside Japan, due to the increased demand for clean burning energy and an abundance of natural gas worldwide. Currently, there
Al Kaplan, C. C. Yang
openaire +1 more source
The Evaluation Of Proposed Offshore Lng Receiving Terminals
Offshore Technology Conference, 1978ABSTRACT A methodology has been developed to evaluate proposed offshore LNG receiving terminals. This methodology, developed during the actual evaluation of a proposed facility, includes all facets affecting the proposed facility, i.e.
Robert J. Tatge +2 more
openaire +1 more source
Model Development for Site Selection Considering the Characteristics of LNG Receiving Terminal
Seung Heon Han
exaly +3 more sources
Reliability Analysis System for LNG Receiving Terminals
IFAC Proceedings Volumes, 1998Abstract A tool capable of quantitative evaluation of the reliability of LNG facilities based on FTA (Fault Tree Analysis) was developed and assembled into a system using an engineering work station. A key feature of the system is it constructs a fault tree automatically from diagrams such as process flow diagrams, and sequence block diagrams.
Toshihide Takehara +4 more
openaire +1 more source
Design of LNG Receiving Terminals
1995Liquefied natural gas (LNG) has become increasingly important as a source of energy in recent years. In the United States, LNG has been used for “peak-shaving” purposes; i.e., natural gas from domestic sources is liquefied during “off-peak” demand periods, and then vaporized when peak demand for gas exists.
D. B. Crawford, C. A. Durr
openaire +1 more source
Offshore Salt-Cavern-Based LNG Receiving Terminal
International Petroleum Technology Conference, 2005Abstract The global LNG business is in the early stages of a significant expansion. Predictions are that the volumes in the LNG industry will more than double in the next ten years. Production capacities of liquefaction trains are increasing and the LNG fleet is growing in numbers and in ships' cargo capacities. The
Michael Morris McCall +2 more
openaire +1 more source
Control System for LNG Receiving Terminal
IFAC Proceedings Volumes, 1991Abstract The operation control system of an LNG terminal must reduce production cost through labor saving and optimization, while providing the safe and uninterrupted gas service. To do this, a hierarchical computerized system based on the distributed computer control system has been implemented at the Osaka Gas LNG terminal.
openaire +1 more source

