Results 271 to 280 of about 423,504 (295)

Advancements in Carbon‐Based Piezoelectric Materials: Mechanism, Classification, and Applications in Energy Science

open access: yesAdvanced Materials, EarlyView.
Carbon‐based piezoelectric materials are systematically categorized based on their structural and functional properties. The mechanisms of stress‐induced charge transfer are elucidated, and their applications are explored across three key domains: piezoelectric catalysis for energy conversion and environmental remediation, piezoelectric biomedical ...
Mude Zhu   +3 more
wiley   +1 more source

Globally interconnected solar-wind system addresses future electricity demands. [PDF]

open access: yesNat Commun
Jiang H   +10 more
europepmc   +1 more source

Optimization of energy management in Malaysian microgrids using fuzzy logic-based EMS scheduling controller. [PDF]

open access: yesSci Rep
Nur-E-Alam M   +10 more
europepmc   +1 more source

A fuzzy-predictive current control with real-time hardware for PEM fuel cell systems. [PDF]

open access: yesSci Rep
Kanouni B   +5 more
europepmc   +1 more source

Load balancing of electrical power distribution system: An overview [PDF]

open access: closed2018 International Conference on Power, Instrumentation, Control and Computing (PICC), 2018
The main methodologies used in load balancing of electrical distribution system have been reviewed in this paper. The following load balancing techniques have been covered: (i) Dynamic leap-frog method, (ii) Dynamic water filling approach, (iii)Fuzzy logic with Newton Raphson optimization method and (iv) Network reconfiguration method.
Madhusudhan Reddy Vuluvala   +1 more
openalex   +2 more sources

Charging Electrically Driven Buses Considering Load Balancing in the Power Grid

open access: closed, 2017
Electrically powered buses in public transportation are increasingly being put into operation. The energy supply needs a careful planning just to keep all busses continuously in operation and to avoid power peaks in the grid. This problem is solved by a two-step planning procedure which is based on a linear model.
Hubert Büchter, Sebastian Naumann
openalex   +3 more sources

Home - About - Disclaimer - Privacy