Results 271 to 280 of about 8,227,085 (309)
Some of the next articles are maybe not open access.
2000
In this chapter, methods for computing lower bounds on the smallest possible project completion time of a project which has to be scheduled under resource constraints are described. The purpose behind developing such methods is twofold. If heuristic procedures as described in Chapter 5 are applied for determining a feasible solution, the size of the ...
openaire +1 more source
In this chapter, methods for computing lower bounds on the smallest possible project completion time of a project which has to be scheduled under resource constraints are described. The purpose behind developing such methods is twofold. If heuristic procedures as described in Chapter 5 are applied for determining a feasible solution, the size of the ...
openaire +1 more source
Strongly exponential lower bounds for monotone computation
Electron. Colloquium Comput. Complex., 2017T. Pitassi, Robert Robere
semanticscholar +1 more source
Bounds testing approaches to the analysis of level relationships
Journal of Applied Econometrics, 2001Yongcheol Shin
exaly

