Results 251 to 260 of about 95,972 (298)
Reliable Communication in Distributed Photovoltaic Sensor Networks: A Large Language Model-Driven Approach. [PDF]
Dong W +7 more
europepmc +1 more source
Cross-PLC: An I3oT Cross Platform to Manage Communications for Applications in Real Factories. [PDF]
Lacasa A +4 more
europepmc +1 more source
ArtifactOps and ArtifactDL: a methodology and a language for conceptualizing and operationalising different types of pipelines. [PDF]
Miñón R +7 more
europepmc +1 more source
Comparative analysis of different PV technologies under the tropical environments. [PDF]
Femin V, Veena R, Petra MI, Mathew S.
europepmc +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
ACCURACY OF INSTALLATION AND MACHINING OF BLANKS IN CAM ARBORS
Spravochnik. Inzhenernyi zhurnal, 2022The cam arbors are widely used for machining of axially symmetrical blanks with the medium and high radial stiffness. GOST 31.1066.04–97 is developed for cam arbors, but it lacks information on the accuracy of installation and machining of blanks on different metal-cutting machines, does not contain recommendations on engineering of such devices, and ...
D. S. Blinov, R. G. Kazhlaev
openaire +1 more source
Installation and operation of superconducting rotating machines
2003 IEEE PES Transmission and Distribution Conference and Exposition (IEEE Cat. No.03CH37495), 2004Superconducting rotating machine technology is developing rapidly. At present, four superconducting rotating machine programs are in progress. General electric is building a 100 MVA superconducting generator under a DoE contract. American superconductor (AMSC) has 3 programs on superconducting machines-a 10 MVAR superconducting synchronous condenser, a
openaire +1 more source
Soil anchors — the methods and machines for their installation
Journal of Mining Science, 2007The application efficiency of anchors with a lock made of granular materials to strengthen soil body slopes is substantiated. Mechanics of interaction between an anchor and the geomedium is considered. The techniques and machines preferable for the anchoring are described, and their test data are reported.
E. P. Rusin +2 more
openaire +1 more source
TESTING and MACHINE INSTALLATION
1974All new installations and additions must be thoroughly checked and tested before being commissioned into service. This is to make sure that the installation is as safe as possible, and that the circuit is operating correctly — something which is often overlooked.
openaire +1 more source

