Results 31 to 40 of about 92,152,259 (129)

Real-Time Order Acceptance and Scheduling Problems in a Flow Shop Environment Using Hybrid GA-PSO Algorithm

open access: yesIEEE Access, 2019
With the emergence of new Industry 4.0 technologies, real-time order acceptance and scheduling is a key problem in a make-to-order (MTO) production system where customers place orders in real-time and the decision maker has to make acceptance or ...
Humyun Fuad Rahman   +2 more
doaj   +1 more source

Engineering Borophene Band Structure Through Thickness

open access: yesAdvanced Science, EarlyView.
Borophene grown on W(110) shows a thickness‐dependent evolution of its structural and electronic properties. Surface microscopy, diffraction, XPS, and ARPES reveal distinct monolayer and bilayer phases. The formation of the second layer is accompanied by structural reconstruction, changes in chemical properties, and new ARPES features, demonstrating ...
Matteo Jugovac   +4 more
wiley   +1 more source

A Review and Assessment of Enterprise Resource Planning for Make-To-Order Companies [PDF]

open access: yes, 2008
Many vendors of Enterprise Resource Planning (ERP) systems claim that their products are widely applicable - configurable to meet the needs of any business, whatever the product or service offering. However, producers of high-variety and bespoke products,
Hendry, L, Aslan, B, Stevenson, M
core   +4 more sources

Analysing the impact of uncertainty reduction on WLC methods in MTO flow shops

open access: yesProduction and Manufacturing Research: An Open Access Journal, 2018
With more and more demanding customers, make-to-order (MTO) companies are becoming more important. Workload control (WLC) is specifically developed for MTO companies.
Kaustav Kundu   +2 more
doaj   +1 more source

Establish a machine learning based model for optimal casting conditions management of small and medium sized die casting manufacturers

open access: yesScientific Reports, 2023
Die casting is a suitable process for producing complex and high precision parts, but it faces challenges in terms of quality degradation due to inevitable defects.
Sangwoo Park, Sekyoung Youm
doaj   +1 more source

Small‐Crystal SAPO‐34 Preparation by Regulating Precursor Mixing Temperature for Methanol‐to‐Olefins Conversion

open access: yesCarbon and Hydrogen, EarlyView.
By tuning the initial mixing temperature from 0°C to 80°C, the crystal size of SAPO‐34 can be adjusted from micro to nanoscale, reflecting a shift from classical single‐crystal growth at low temperatures to non‐classical polycrystalline aggregation at high temperatures.
Guanghua Liang   +4 more
wiley   +1 more source

Scheduling of a hybrid make-to-stock/make-to-order production system through the group analytic hierarchy process ordering (GAHPO) [PDF]

open access: yes, 2012
Este estudio se ocupa de la programación de una planta de producción que produce productos fabricados bajo inventario (Make-to-Stock, MTS) y productos fabricados bajo pedido (Make-to-Order, MTO).
Escobar Jaramillo, Pamela
core  

Mix flexibility optimisation in hybrid make-to-stock / make-to-order environments in process industries

open access: yesCogent Engineering, 2018
When there are sequence-dependent changeovers on a shared resource in hybrid make-to-stock/make-to-order (MTS/MTO) environments in process industries, coordination mechanisms for mix flexibility optimisation are critical for minimising changeover ...
Shellyanne Wilson
doaj   +1 more source

Proposta de um sistema de controle da produção para fabricantes de calçados que operam sob encomenda Proposal of a production control system for shoemakers operating in a resources-to-order or make-to-order product market environment

open access: yesGestão & Produção, 2008
Este artigo apresenta uma proposta de sistema de controle da produção para regular o fluxo de materiais de pequenas e médias empresas fabricantes de calçados que adotam a política de atendimento à demanda RTO (resources-to-order) ou MTO (make-to-order ...
Fábio Molina da Silva   +1 more
doaj   +1 more source

Matching Supply and Demand with Lead-Time Dependent Price and with Safety Stocks in a Make-to-Order Production System

open access: yesSystems, 2022
We studied the ability to reduce the supply–demand mismatch of a periodic Make-to-Order (MTO) production system using safety stocks with marketing managing demand using lead-time guarantee and price as levers.
Sonu Kumar Das   +1 more
doaj   +1 more source

Home - About - Disclaimer - Privacy