Results 41 to 50 of about 1,438 (207)

Uniform Parallel-Machine Scheduling for Minimizing Total Resource Consumption With a Bounded Makespan

open access: yesIEEE Access, 2017
This paper examines the uniform parallel-machine scheduling problem in which the objective aims to minimize the total resource consumption (TRC) with a bounded makespan. A matheuristic is proposed to deal with this strongly NP-hard problem.
Shih-Wei Lin, Kuo-Ching Ying
doaj   +1 more source

Late Acceptance Hill-Climbing Matheuristic for the General Lot Sizing and Scheduling Problem with Rich Constraints

open access: yesAlgorithms, 2020
This paper considers the general lot sizing and scheduling problem with rich constraints exemplified by means of rework and lifetime constraints for defective items (GLSP-RP), which finds numerous applications in industrial settings, for example, the ...
Andreas Goerler   +2 more
doaj   +1 more source

A Matheuristic Approach to the Integration of Three-Dimensional Bin Packing Problem and Vehicle Routing Problem with Simultaneous Delivery and Pickup

open access: yesMathematics, 2023
This work presents a hybrid approach to solve a distribution problem of a Portuguese company in the automotive industry. The objective is to determine the minimum cost for daily distribution operations, such as collecting and delivering goods to multiple
Ana Moura   +3 more
doaj   +1 more source

A simulation-based optimisation for the stochastic green capacitated p-median problem

open access: yesJournal of Industrial Engineering and Management, 2022
Purpose: This paper aims to propose a new model called the stochastic green capacitated p-median problem with a simulation-based optimisation approach. An integer linear programming mathematical model is built considering the total emission produced by ...
Arif Imran   +5 more
doaj   +1 more source

On Multistage Multiscale Stochastic Capacitated Multiple Allocation Hub Network Expansion Planning

open access: yesMathematics, 2021
The hub location problem (HLP) basically consists of selecting nodes from a network to act as hubs to be used for flow traffic directioning, i.e., flow collection from some origin nodes, probably transfer it to other hubs, and distributing it to ...
Laureano F. Escudero, Juan F. Monge
doaj   +1 more source

Network-Aware Campaign Optimization in Telecommunications Under Communication Constraints

open access: yesIEEE Access
This study addresses the campaign optimization problem in telecommunications, focusing on determining how, when, and through which channels to engage customers most effectively.
Dursun Koc, Dilek Gunnec
doaj   +1 more source

Kernel Search for the Capacitated Vehicle Routing Problem

open access: yesApplied Sciences, 2022
This paper addresses the Capacitated Vehicle Routing Problem (CVRP), which is a widely studied optimization problem due to its relevance to the field of transportation, distribution, and logistics.
Zuzana Borčinová
doaj   +1 more source

Automatic Design for Matheuristics

open access: yes, 2021
Matheuristics have become widespread and effective methods for tackling the generalized assignment problem (GAP) and many other NP-hard problems. In fact, in this book we have many such methods, ranging from metaheuristics and mathematical programming techniques but mainly to real matheuristics.
Maniezzo, Vittorio   +2 more
openaire   +1 more source

Matheuristic methods for solving the multi-calendar naval surface ship work period problem

open access: yes, 2023
The naval surface ship work period problem (NSWPP) is a project scheduling problem in which a large number of activities related to ship periodic maintenance, repairs, renewal and engineering changes (EC) activities are planned and executed. The NSWPP is
Kim, Hyojae
core  

Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach

open access: yesGazi Üniversitesi Fen Bilimleri Dergisi
In this study, a scheduling problem for unrelated parallel machines with sequence-dependent setup times, specifically in the context of tire production, is addressed.
Merhad Ay
doaj   +1 more source

Home - About - Disclaimer - Privacy