Results 21 to 30 of about 59 (57)
Penelitian ini bertujuan untuk menganalisis efektivitas preventive maintenance pada forklift dan reach truck di PT Medan Distribusindo Raya melalui perhitungan Mean Time Between Failure (MTBF), Mean Time To Repair (MTTR), dan Risk Priority Number (RPN). Berdasarkan data kerusakan tahun 2024, nilai MTBF forklift dan reach truck tercatat sebesar ±717 jam,
Wirda Novarika +2 more
openaire +1 more source
With the rapid growth of the hybrid electric vehicle (HEV) market, stakeholders must refine after‐sales logistics, particularly spare parts (SPs) provisioning. Adequate forecasting of demand and pricing underpins these efforts. This paper presents a feedforward artificial neural network (FF‐ANN) that, drawing on 15 predictor variables, assigns each SP ...
Omar Abueed +5 more
wiley +1 more source
Despite the continuous improvement in the technical performance of fiber‐optic early warning systems, their actual application results in preventing third‐party intrusion into oil and gas pipelines are often less than ideal. This issue stems largely from the lack of comprehensive postdeployment evaluation methodologies, making it difficult to identify ...
Liangguo Liu +7 more
wiley +1 more source
This paper proposes a high‐reliability design for a space‐qualified L‐Ka (band) up‐converter used in millimeter‐wave communication systems. The design addresses key challenges related to phase noise, image rejection, output power, and environmental adaptability.
Dingzhan Yu +8 more
wiley +1 more source
Bayesian Estimation of Failure Rates in Two‐Unit Series Systems: Analyzing Train Brake Systems
This study investigates the failure rates of train braking systems, recognizing their pivotal role in vehicle performance. Using a Bayesian estimation approach, the study focuses on parameterizing the failure rates of two brakes arranged in series to form a two‐unit train brake system. A bivariate exponential model, accommodating varying failure rates,
Sohail Ahmad +8 more
wiley +1 more source
A fully simulation‐based study integrating graphene/h‐BN/MoS2/phosphorene heterostructures for fault detection in high‐voltage power lines. Coupled DFT‐FEA models predict mechanical, thermal, discharge, and EMI performance with >99.7 % accuracy. The work establishes a multi‐physics computational paradigm for predictive maintenance and digital‐twin ...
Arash Vaghef‐Koodehi +1 more
wiley +1 more source
Study boundary and subsystem decomposition of the hydrogen‐injection facility: (1) Safety System, (2) Hydrogen System, (3) Electrolyzer, Power Supply, and Lye Preparation and Circulation, (4) Cooling System, (5) Potassium Hydroxide System, and (6) Fresh Water System.
Finn Börje Wesemeyer, Karsten Müller
wiley +1 more source
Penelitian ini menganalisis kebijakan preventive maintenance pada mesin Wire Rope Hoist Crane di PT WIKA Beton Tbk Plant Karawang menggunakan indikator Mean Time Between Failure (MTBF) dan Mean Time To Repair (MTTR). Data historis periode Januari 2024 sampai Januari 2025 menunjukkan total waktu operasi 3.320 jam, 10 kejadian kerusakan, dan total ...
Bayu Adzikri Ramadhan +2 more
openaire +1 more source
Modern driver with flexible DC link and a novelty topology for controlling it; in which, two‐level or three‐level voltage source converters (2LVSC or 3LVSC) with specific arrangement 8 + 1 power modules as an innovation will be employed in variable speed pumped storage power plants.
Mohammad Reza Semsar +3 more
wiley +1 more source
Reliability study on avionics: feasibility study to determine mean time between failure (MTBF)
No momento presente o mundo enfrenta um aumento na pressão para que os trabalhos se executem de modo mais rápido, melhor e mais barato, exigindo que os engenheiros prevejam com precisão a fiabilidade dos produtos. Nas fases iniciais do processo de design do produto, essas previsões precisas contribuirão não só para um produto mais robusto e fiável, mas
openaire +1 more source

