Results 21 to 30 of about 88,227,781 (177)

Using Analysis of Pareto and Fault Tree to Parameters Simulated in Predictive Maintenance policies and Management Methods [PDF]

open access: yesKirkuk Journal of Science, 2017
The study was take place with statistical analyasis of available data about faults ( downtime DT, mean time between faults MTBF, mean time to repair MTTR) as dependant variables on fault frequency f as independent variables for fault modes of ...
Omar A.Mohammed   +2 more
doaj   +1 more source

Reliability assessment of a gas generating station in Ogun State, Nigeria

open access: yesJournal of Applied Sciences and Environmental Management, 2018
This study evaluates and presents the reliability and availability of a power plant, Akute Power Plant, Ogun State, Nigeria, during the period of January – December, 2015.
O.G. Olasunkanmi   +4 more
doaj   +1 more source

Manajemen Perawatan Menggunakan Metode RCM Pada Mesin Produksi Kertas

open access: yesJurnal Optimasi Sistem Industri, 2020
One of the leading manufacturers in packaging paper in Indonesia has six production machines. To keep the production machine always in the best condition, then the role of maintenance is significant.
Hery Hamdi Azwir   +2 more
doaj   +1 more source

Enhancing Reliability Indices in Power Distribution Grids Through the Optimal Placement of Redundant Lines Using a Teaching–Learning-Based Optimization Approach

open access: yesEnergies
Given the pressing need to strengthen operational reliability in electrical distribution networks, this study proposes an optimization methodology based on the Teaching–Learning-Based Optimization (TLBO) algorithm for the strategic location of redundant ...
Johao Jiménez   +2 more
doaj   +1 more source

Optical Multi-Context Blind Scrubbing for Field Programmable Gate Arrays

open access: yesIEEE Photonics Journal, 2020
This paper presents aproposal of a new optical multi-context blind scrubbing that can not only increase the soft-error tolerance of the configuration memory of field programmable gate arrays (FPGAs) but also support high-speed dynamic reconfiguration ...
Yusuke Takaki, Minoru Watanabe
doaj   +1 more source

Analisis Preventive Maintenance Berdasarkan Mean Time Between Failure (MTBF) Dan Mean Time To Repair (MTTR) Pada Alat Blow Molding Di PT XYZ

open access: yesJurnal Pengabdian Masyarakat Bangsa
PT XYZ merupakan perusahaan yang bergerak di bidang manufaktur aksesoris mobil otomotif dan interior kelautan yang berkembang. Sebagian besar produk plastik yang dihasilkan dibuat menggunakan mesin blow molding dengan produk yang sangat bervariasi Sehingga, apabila terjadi kerusakan maka akan menyebabkan produksi tidak bisa berjalan sebagaimana ...
Silvia Silvia   +2 more
openaire   +1 more source

Impacts of Change‐Type and State‐Type System Qualities on Complex System Architectures

open access: yesSystems Engineering, EarlyView.
ABSTRACT System qualities, such as scalability, expandability, and reconfigurability, are key requirements of complex systems. Requirements associated with system qualities are important factors in design trade space analyses, but systems engineering design methodologies make only limited use of these qualities, hindering a holistic understanding of ...
Christina F. Bridges   +1 more
wiley   +1 more source

Temporal trends and reliability of computed tomography scanner failures: evidence from a real-world time-series analysis

open access: yesFrontiers in Physics
ObjectiveWe aimed to characterize temporal and component-specific patterns of CT malfunctions and identifying optimal monitoring intervals are critical to strengthening preventive maintenance and informed equipment management.MethodsThis study collected ...
Xiaoxiao Luan   +11 more
doaj   +1 more source

Design and Implementation of a Digitalised Marine Aids to Navigation Monitoring System for High‐Density Maritime Traffic Waters: A Case Study of the Strait of Malacca

open access: yesApplied Research, Volume 5, Issue 5, October 2026.
A digitalised Aids‐to‐Navigation monitoring system (ARMS) was deployed across 478 installations in the Strait of Malacca and Malaysian waters, integrating multi‐sensor edge validation, hybrid AIS/VHF/cellular communication, and a centralised platform. It achieved 98.3% availability and cut fault‐detection time from weeks to just 8.4 min.
Muhammad Fadhli Makhtar   +5 more
wiley   +1 more source

Home - About - Disclaimer - Privacy