Electrolyzer Sizing and Techno‐Economic Assessment of Small‐Hydropower‐Based Green Hydrogen Using 3 Years of Hourly Generation Data

open access: yesEnergy Science &Engineering, EarlyView.
Three years (26,280 h) of measured Miryang Dam hydropower data were used to screen 300–1200 kW PEM electrolyzer capacities. A 600 kW unit provided the equal‐weight technical balance between hydropower capture (84.71%) and electrolyzer utilization (86.25%), whereas the planned 1 MW design captured 98.11% of available renewable energy but operated at a ...
Yonghae Jang, Yosoon Choi
wiley   +1 more source

A continuous-time unit-based MILP formulation for the resource-constrained project scheduling problem [PDF]

open access: yes, 2018
In the basic resource-constrained project scheduling problem RCPSP, one aims at selecting starting times for the tasks of a project such that the project makespan is minimized and the project schedule is precedence- and resource-feasible.
Trautmann, Norbert   +5 more
core   +1 more source

Assembly Sequence Effects on Control Co‐Design of Robot Manipulators: A Planar Study Motivated by the (Dis)Assembly of SPI2 Systems

open access: yesJournal of Mechanical Design, EarlyView.
ABSTRACT The robotic spatial assembly and disassembly of compact interconnected systems is a multidirectionally coupled problem in which physics‐valid layouts, assembly sequence plans, and robot morphology, motion, and control influence one another. Extracting valuable insights from these couplings facilitates the limited redesign of current robots or ...
Abbas Bataleblu, James T. Allison
wiley   +1 more source

Maintenance Scheduling Optimization Using MILP and Asset LCA

open access: yesJournal of Engineering, Project, and Production Management
In asset lifecycle management, the increasing scale of power equipment and the complexity of the operating environment challenge traditional maintenance and scheduling methods to meet the requirements of high efficiency, economy, and reliability ...
Qiqi Zhang, Xufeng Zhou, Yi Cao
doaj   +1 more source

An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

open access: yesEnergies, 2022
An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals.
Guodong Liu   +3 more
doaj   +1 more source

Leveraging Public Transit for Robotic Deliveries: A Column Generation Approach

open access: yesNaval Research Logistics (NRL), EarlyView.
ABSTRACT Autonomous mobile robots (AMRs) are small, electric, wheeled vehicles that operate at pedestrian speeds. In the last‐mile delivery service considered in this study, a fleet of AMRs is deployed across multiple recharging depots within a service area, from which they depart to perform point‐to‐point deliveries. We consider an operational setting
Yishay Shapira, Mor Kaspi
wiley   +1 more source

POETS Blockchain MILP Solver - Initial Release

open access: yes
<p><strong>Full Changelog</strong>: https://github.com/UmaMaquinaDeOndas/milp-solver/commits/v1.0.0</p ...
Scott, Ian J., Huang, Chung-Ting
core   +1 more source

Machine Learning‐Assisted Optimization for Dynamic Supply Network Design in the Additive Manufacturing Platform

open access: yesNaval Research Logistics (NRL), EarlyView.
ABSTRACT Distributed manufacturing enabled by additive manufacturing (AM) allows supply chains to rapidly adapt to changing market conditions through flexible facility relocation and capacity adjustment. However, existing studies largely overlook the logistical aspects of AM‐based supply chains and typically treat facility location and logistics ...
Behrang Bootaki, Guoqing Zhang
wiley   +1 more source

Handling software upgradeability problems with MILP solvers [PDF]

open access: yesElectronic Proceedings in Theoretical Computer Science, 2010
Upgradeability problems are a critical issue in modern operating systems. The problem consists in finding the "best" solution according to some criteria, to install, remove or upgrade packages in a given installation.
Claude Michel, Michel Rueher
doaj   +1 more source

Interdiction Models and Heuristics for Graph Propagation

open access: yesNetworks, EarlyView.
ABSTRACT Given a graph G=(V,E)$$ G=\left(V,E\right) $$ and a set S⊂V$$ S\subset V $$ of activated/infected nodes, we consider the problem of determining the set of c$$ c $$ nodes that minimizes the network propagation on the subgraph that results from the removal of those c$$ c $$ nodes. To measure network propagation, we assume that a node i$$ i $$ is
Agostinho Agra, José Maria Samuco
wiley   +1 more source