Results 11 to 20 of about 596,455 (338)

Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field

open access: yesGong-kuang zidonghua, 2022
Due to the complexity of road in open-pit mine, the existing truck travel time prediction methods are difficult in the actual deployment. This leads to the truck optimal scheduling system only realizing scheduling instead of optimization.
TIAN Fengliang   +8 more
doaj   +2 more sources

Self-service truck loading system in coal mine

open access: yesGong-kuang zidonghua, 2017
For complicated process and low efficiency of current truck loading in coal mine,a design scheme of self-service truck loading system in coal mine was proposed on the basis of operation mode of self-service petrol station.
GUO Xi
doaj   +2 more sources

Digitalization of mine operations: Scenarios to benefit in real-time truck dispatching [PDF]

open access: yesInternational Journal of Mining Science and Technology, 2017
One of the key factors in a profitable open-pit mine is the efficiency of the waste disposal system. Using GPS-technology, the truck-dispatching decisions can be made in real-time but the chosen strategy has a crucial role. Therefore, finding the optimal
Patarawan Chaowasakoo   +3 more
doaj   +2 more sources

Environmental and Economic Evaluation of Diesel and Electric Mining Trucks in Surface Mines

open access: green
Surface mining operations rely heavily on haul trucks for overburden and mineral transportation, making them one of the largest contributors to energy consumption, greenhouse gas (GHG) emissions, and operating costs (International Council on Mining and Metals [ICMM], 2023; International Energy Agency [IEA], 2024).
Sumeet Kishore   +7 more
openaire   +3 more sources

Research on Active Anti-collision Method of Unmanned Mine Truck Based on Predicted Trajectory

open access: yesKongzhi Yu Xinxi Jishu, 2022
Existing mine truck unmanned driving systems operating in complex mining areas have many potential safety hazards, such as problems with the planning trajectory of the dispatching system, failure to update the mining area operation map in time, and the ...
LI Cheng, ZHANG Qian, WANG Bin
doaj   +3 more sources

Periodic preventive maintenance strategy of open-pit mine truck based on age-reduction model

open access: yesMeitan kexue jishu, 2023
In view of high maintenance cost of trucks in the production and transportation of open-pit mine, a combination of periodic preventive maintenance and minor repairs was adopted for truck.
Wenjing LI   +4 more
doaj   +1 more source

Research on the Energy Management Strategy for Mine Electric-wheel Dump Truck with Hybrid Power System

open access: yesKongzhi Yu Xinxi Jishu, 2022
Traditional mine dump truck using diesel-electric drive technology have high energy consumption and serious pollution. To improve fuel economy of a hybrid power dump truck, firstly, it analyzes system composition, working mode and transportation ...
CHEN Lingjian   +4 more
doaj   +3 more sources

Intelligent Operation and Maintenance Solution Based on Condition Repair for Electric Drive System of Mine Electric-wheel Dump Truck

open access: yesKongzhi Yu Xinxi Jishu, 2022
Heavy-duty mine electric-wheel dump truck is one of the commonly used vehicles for large-scale open-pit mines. In harsh and complex application environment of the mining area, failure rates of key components of electric-wheel dump truck are high, and ...
ZHOU Zhiyu, HE Chengzhao, ZHU Wenlong
doaj   +3 more sources

Research on Speed Control of Unmanned Mine Electric-wheel Dump Truck Considering Time-varying Response Characteristics of Steering System

open access: yesKongzhi Yu Xinxi Jishu, 2022
Full hydraulic steering system adopted by mine electric-wheel dump truck is powered by steering hydraulic accumulator and steering hydraulic pump. Its actual steering response ability affected by road surface condition, steering oil pressure and flow ...
KANG Yuanrong   +4 more
doaj   +3 more sources

Home - About - Disclaimer - Privacy