Results 41 to 50 of about 2,450 (197)
A company's ability to meet its goals depends heavily on the smooth operation of its production process. To ensure that the production machinery operates smoothly and without any breakdowns, it is essential to implement effective maintenance that addresses any issues related to the equipment.
Silvana Alfionita +1 more
openaire +1 more source
Digital‐Twin‐Enabled, Time‐Aware Anomaly Detection for Industrial Cyber‐Physical Systems
The graphical abstract (Graphical Abstract figure) summarises the proposed pipeline: multivariate ICS data streams are windowed and normalised, fed into a temporal LSTM–DNN encoder and per‐sensor operating‐envelope learner, combined via calibrated fusion and finally surfaced through an operator‐facing digital twin that provides event timelines, top ...
Wulfran Fendzi Mbasso +5 more
wiley +1 more source
Analisis Preventif Maintenance pada Forklift dan Reach Truck dengan Metode Menghitung Mean Time Between Failure (MTBF) dan Mean Time to Repair (MTTR) di PT Medan Distribusindo Raya [PDF]
Penelitian ini bertujuan untuk menganalisis efektivitas preventive maintenance pada forklift dan reach truck di PT Medan Distribusindo Raya melalui perhitungan Mean Time Between Failure (MTBF), Mean Time To Repair (MTTR), dan Risk Priority Number (RPN ...
Novarika, Wirda +2 more
core +3 more sources
Multiple Radios for Fast Rendezvous in Heterogeneous Cognitive Radio Networks
In cognitive radio networks (CRNs), if two unlicensed secondary users (SUs) want to communicate with each other, they need to rendezvous with each other on the same channel at the same time.
Aohan Li, Guangjie Han, Tomoaki Ohtsuki
doaj +1 more source
The study aims to mitigate these risks through the implementation of a structured RCM policy. The findings indicate that the machines in the spinning section are the most critical in terms of their failure impact. Implementing the RCM methodology demonstrates significant economic benefits by reducing risk through a targeted FMEA approach.
Befekadu Zeleke Asfaw +3 more
wiley +1 more source
This paper conducted a unique availability and economic analysis of two energy hubs (EHs) with different capacities (2 MW and 900 kW). The proposed EH supplies the electricity and heat requirements of a high‐rise residential complex in Tehran. A new index called real availability was introduced and implemented, integrating hourly demand profiles and ...
Peyman Zaroorian +4 more
wiley +1 more source
Using Analysis of Pareto and Fault Tree to Parameters Simulated in Predictive Maintenance policies and Management Methods [PDF]
The study was take place with statistical analyasis of available data about faults ( downtime DT, mean time between faults MTBF, mean time to repair MTTR) as dependant variables on fault frequency f as independent variables for fault modes of ...
Omar A.Mohammed +2 more
doaj +1 more source
As the global energy sector seeks to reduce dependence on fossil fuel–based generation and mitigate carbon emissions, there is an increasing need to evaluate advanced enabling platforms that support sustainable energy integration. Technologies, such as digital twin (DT) and virtual power plant (VPP), provide enhanced capabilities for detailed modeling,
Obed N. Onsomu +3 more
wiley +1 more source
تحسين وثوقية أنظمة التحكم الحاسوبية باستخدام التشخيص المباشر
دار البحث حول تحسين وثوقية الحاسوب بوصفه عنصراً أساسياً للمراقبة والتحكم بمحطة لتوليد الطاقة الكهربائية (أو غرفة العمليات - العناية المشددة بالمشافي)، وغيرها من التطبيقات المماثلة.
د. م أحمد خضور
doaj
To enhance the reliability of industrial wireless sensor networks (IWSNs), this study develops a state‐based continuous‐time Markov model for duplex and triplex architectures equipped with warm and cold standby backup sensors. The proposed model explicitly defines the state space, transition structure, and failure–repair dynamics for one, two, and ...
Ahmadreza Zamani +3 more
wiley +1 more source

