Results 221 to 230 of about 11,843 (259)
Some of the next articles are maybe not open access.
Economic Viability of Multilateral Wells
Journal of Petroleum Technology, 2000This article is a synopsis of paper SPE 59202, "The Economic Viability of Multilateral Wells," James P. Oberkircher, Sperry-Sun Drilling Services, originally presented at the 2000 IADC/SPE Drilling Conference, New Orleans, 23-25 February.
openaire +1 more source
A Comprehensive Model of Multilateral Well Deliverability
Proceedings of International Oil and Gas Conference and Exhibition in China, 2000Abstract We developed a deliverability model to predict the performance of multilateral wells. We first constructed a horizontal lateral model, which couples a reservoir inflow model with a wellbore flow model to calculate the production rate from each lateral. Pressure drop along the lateral was considered in the model.
W. Chen, D. Zhu, A. D. Hill
openaire +2 more sources
The Economic Viability of Multilateral Wells
Proceedings of IADC/SPE Drilling Conference, 2000AbstractMultilateral wells are receiving much attention in the oil industry. Despite the increasing amount of publicity, multilateral wells in practice account for only a small fraction of the total number of wells drilled in the world today. One reason for this limited application may be that the economic benefit of drilling these wells may be in ...
openaire +1 more source
Stability of Junctures for Multilateral/Multibranched Wells
SPE Asia Pacific Improved Oil Recovery Conference, 1999Abstract In creating complex well architecture a primary exercise is the initiation of a second branch from an existing "parent" or "mother" hole. The latter can be vertical, inclined or horizontal. The branch can be initiated at a range of angles depending on the drilling hardware used.
J. A. Fuentes +2 more
openaire +1 more source
Well-Completion Effects on the Performance of Horizontal and Multilateral Wells
Journal of Petroleum Technology, 2006This article, written by Technology Editor Dennis Denney, contains highlights of paper SPE 96530, "An Evaluation of Well-Completion Impacts on the Performance of Horizontal and Multilateral Wells," by L.-B. Ouyang, SPE, and B. Huang, SPE, Chevron Energy Technology Co., prepared for the 2005 SPE Annual Technical Conference and Exhibition, Dallas, 9–12 ...
openaire +1 more source
Cementing Multilateral Wells With Latex Cement
Journal of Petroleum Technology, 1997This article is a synopsis of paper SPE 37623, "Cementing Multilateral Well with Latex Cement," by R. Abdul-Rahman, SPE, BJ Oilwell Services Sdn. Bhd., and A. Chong, SPE, Sarawak Shell Sdn. Bhd./Sabah Shell Petroleum Co. Ltd., originally presented at the 1997 SPE/IADC Drilling Conference held in Amsterdam, 4-6 March.
openaire +1 more source
Study of Multilateral-Well-Construction Reliability
SPE Drilling & Completion, 2017Summary Multilaterals are often cited as technology that can be implemented to maximize reservoir-recovery rates. However, few operators have been willing to put multilaterals into practice. The most frequently cited reason for not considering multilaterals is risk.
Ben Butler +3 more
openaire +1 more source
The Optimum Junction Depth for Multilateral Wells
International Oil and Gas Conference and Exhibition in China, 2000AbstractPlacement of the multilateral junction is one of the most critical elements in the design of a multilateral well. A misplaced or mal-performing junction can have an adverse effect on an otherwise successful multilateral project. The optimum placement of the junction is a function of reservoir, geological, drilling, and completion criteria.
Ray Brister, Jim Oberkircher
openaire +1 more source
Innovative Geosteering Technology in Multilateral Wells
Journal of Petroleum Technology, 2014This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 24002, ’Innovative Geosteering Technology Used in Drilling Smart Multilateral Wells, Kuwait,’ by T. El Gezeery, A. Aziz Ismael, K. Al-Anezi, G.S. Padhy, Fawaz Al Saqran, A. Abdul-Latif, and J. Silambuchelvan, Kuwait Oil Company, and J.
openaire +1 more source
Features of repair work in multilateral wells
Azerbaijan Oil IndustryThe article provides brief information about the design of the bottom of wells, underground equipment and their design, which are supplied during the completion of double-barreled wells. Special tools and foreign-made equipment used during repair work on multilateral wells, and the technology for their installation in the wellbore were also ...
Sh.Z. Ismailov, Yu.A. Ibragimov
openaire +1 more source

