Results 151 to 160 of about 51,146 (248)

Decommissioning of offshore wind turbines

open access: yes, 2019
Decommissioning is a key process in the offshore wind industry because all substructures, bottom fixed or floating, have to be removed and completely dismantled at the end of their service life. There is still no experience of decommissioning a floating wind substructure and only two very small offshore wind farms with bottom fixed platforms have ...
openaire   +2 more sources

Materials Design and Structural Health Monitoring of Horizontal Axis Offshore Wind Turbines: A State-of-the-Art Review. [PDF]

open access: yesMaterials (Basel)
Tong Y   +11 more
europepmc   +1 more source

Installation of Offshore Wind Turbine

open access: yes, 2011
Ingenium AS is developing a new concept for transporting and installing fixed wind turbines, mainly jacket structures. As a part of the installation the jacket is lowered down to the seabed from a free hanging configuration, supported by a hydraulic frame.
Torgersrud, Amund, Fossestøl, Atle
openaire   +1 more source

Home - About - Disclaimer - Privacy