Results 71 to 80 of about 1,893 (138)

Development of ZJ50/3150DB Moveable High-floor Artificial Island Rig

open access: yesShiyou jixie, 2016
In order to carry out cluster drilling operation in the narrow space of Yuedong Artificial Island B and make drilling rig operation and movement meet the requirements of trouble-free installation and avoidance for the pumping unit installed in the well ...
Li Quanxing   +6 more
doaj  

Analysis on End-face Temperature of High-speed Oil-Gas Two-Phase Backflow Pumping Seal

open access: yesIOP Conference Series: Materials Science and Engineering, 2019
S X Li, L Chen, H Li, S C Li, Q Z Li
openaire   +1 more source

Methodology for Assesment of Drilling Fluid Additives for Drilling of Depleted Reservoirs Using Barite-Weighted Oil-Based Drilling Fluid and Testing with Backflow Through Production Screens

open access: yes
Drilling through depleted reservoirs presents significant operational challenges due to potentially reduced formation pressure, increased risk of lost circulation, and potential wellbore instability. These issues create further complexities when drilling across reservoir sections where formation damage and production impairments must be minimized.
openaire   +1 more source

Home - About - Disclaimer - Privacy