Results 121 to 130 of about 119,350 (306)
Prediction of open-pit mine truck travel time based on LSTM-TabTransformer
Truck travel time prediction is the basis for real-time optimal scheduling decision of open-pit trucks. Most prediction models for open-pit truck travel time mainly rely on a single machine learning algorithm or model to optimize the hyperparameters ...
Jingchang Zhao, Lei Gao, Shihao Ren
doaj +1 more source
NUMERICAL SIMULATION OF JOINTED ROCK MASS IN GEOMECHANICAL PROBLEMS [PDF]
Study the possibility of realistically numerical simulation of a jointed rock mass and estimate the design rock mass strength involving discontinuity surface conditions and various shapes and sizes of rock ...
BABETS, Dmytro +9 more
core
The Great Dyke of Zimbabwe is notable for its rich platinum group metal deposits but poses significant geological and geotechnical challenges due to its complex rock types and structural features. Traditional pillar design methods are insufficient for addressing these complexities; the study suggests incorporating advanced techniques such as machine ...
Tawanda Zvarivadza +3 more
wiley +1 more source
An improved dual-strength reduction method of slope stability analysis using Hill Climbing Algorithm
How to determine reduction strategy between cohesion (c) and internal friction angle (ϕ) is crucial for slope stability evaluation using the dual-strength reduction method (DSRM).
Chunguang Wang +7 more
doaj +1 more source
In the process of water‐soluble cavern construction of salt cavern energy storage, since the interlayer does not dissolve in water easily, sudden collapse will cause engineering accidents such as bending and damage of the inner tube of the cavern.
Zenghui Zhao +5 more
wiley +1 more source
When large-scale near-level coal field adopts open-pit mining, in order to realise safe and efficient production and recover the investment cost as soon as possible, it usually adopts the way of mining in sub-districts, so before the old mining area is ...
Guangwei LIU +7 more
doaj +1 more source
Data mining for mine-mill ore grade reconciliation at Erdenet Mining Corporation [PDF]
Master's Project (M.S.) University of Alaska Fairbanks, 2016This project investigates the relationship between the mined ore and the produced copper at the Erdenet Mining Corporation (EMC) surface copper mine in Mongolia.
Sarantsatsral, Narmandakh
core
A novel cavity contraction solution and multilayer shaft wall model were developed to analyze deep shaft stability, considering rock viscosity, support structures, and water pressure, with successful validation through a Hulusu Coal Mine case study.
Bin Chen +5 more
wiley +1 more source
Open Pit Mining Operations [PDF]
This report on open pit mining operations will discuss: the history of open pit mining, factors important in the selection of open pit mining and in the development of an open pit, and the various mining and operational methods used in this type of an ...
Simon, James A.
core +1 more source
An experimental device for physical simulation of hydraulic fracturing, comprising: a load‐bearing mechanism with multiple interconnected plates that collectively form an sample chamber; a load‐generating mechanisms, with multiple load‐generating mechanisms arranged within the experimental chamber.
Delei Shang +5 more
wiley +1 more source

