Results 201 to 210 of about 253,387 (256)
Optimization of hybrid solar chimney power plant using Pearson and k-means analysis for green hydrogen and electricity production. [PDF]
Jemal A +7 more
europepmc +1 more source
Robust securable economic operation of grid-connected renewable integrated energy system with hydrogen storage and electric and fuel cell vehicles. [PDF]
Varei H +3 more
europepmc +1 more source
A memorized multi-objective Sinh-Cosh optimizer for solving multi-objective engineering design problems. [PDF]
El-Nagar D, Zeidan I, Issa M.
europepmc +1 more source
Thermal management of lithium-ion batteries: from single cooling to hybrid cooling. [PDF]
Qianqian Z +6 more
europepmc +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
Decompositions for Optimal Power Flows
IEEE Power Engineering Review, 1983technical ...
Talukdar +2 more
openaire +1 more source
2021
This chapter gives detail of the OPF optimization problem, with the aim of minimizing the operational system costs and locating an optimal generation schedule while satisfying grid constraints. The chapter shows the effective usage of OPF for system planning and generation scheduling.
Nnamdi Nwulu, Saheed Lekan Gbadamosi
openaire +1 more source
This chapter gives detail of the OPF optimization problem, with the aim of minimizing the operational system costs and locating an optimal generation schedule while satisfying grid constraints. The chapter shows the effective usage of OPF for system planning and generation scheduling.
Nnamdi Nwulu, Saheed Lekan Gbadamosi
openaire +1 more source
2002
In the load flow analysis problem, generator voltage magnitudes, active power generation (except for the slack bus), and P and Q loads at all the busses is known beforehand. Consequently, to determine the power system state, we have to solve 2n - g - 1 equations in as many unknowns, where n is the number of busses in the system and g is the number of ...
S. A. Soman +2 more
openaire +2 more sources
In the load flow analysis problem, generator voltage magnitudes, active power generation (except for the slack bus), and P and Q loads at all the busses is known beforehand. Consequently, to determine the power system state, we have to solve 2n - g - 1 equations in as many unknowns, where n is the number of busses in the system and g is the number of ...
S. A. Soman +2 more
openaire +2 more sources

