Results 51 to 60 of about 2,756,714 (295)

An Optimization Scheduler in the Intranet Grid

open access: yes, 2016
Scheduling of processes is the basic task for a grid computing. This role is responsible for the allocation of time for computational agents. The calculation agent can include a wide range of devices, based on various types of computer systems. Is it possible to efficiently build a grid infrastructure in the company environment. The grid can be used in
Petr Lukasik, Martin Sysel
openaire   +2 more sources

Optimal outpatient appointment scheduling [PDF]

open access: yesHealth Care Management Science, 2007
In this paper optimal outpatient appointment scheduling is studied. A local search procedure is derived that converges to the optimal schedule with a weighted average of expected waiting times of patients, idle time of the doctor and tardiness (lateness) as objective. No-shows are allowed to happen. For certain combinations of parameters the well-known
Kaandorp, G., Koole, G.M.
openaire   +3 more sources

Abatacept for Prophylaxis of Acute and Chronic Graft‐Versus‐Host‐Disease in Children Undergoing Allogeneic Hematopoietic Stem Cell Transplantation—A Systematic Review and Meta‐Analysis of Cohort Studies

open access: yesPediatric Blood &Cancer, EarlyView.
ABSTRACT Background Graft‐versus‐host disease (GvHD) remains one of the most significant complications of hematopoietic stem cell transplantation (HSCT). Abatacept, a selective T‐cell costimulation modulator, is a relatively novel prophylactic agent, though pediatric data remain limited.
Matthijs D. Kruizinga   +3 more
wiley   +1 more source

Scheduling and control of high throughput screening systems with uncertainties and disturbances

open access: yesProduction and Manufacturing Research: An Open Access Journal, 2022
Based on the existing research work on the modeling and control of cyclically operated high-throughput screening systems, this paper presents the scheduling and control of high-throughput screening systems with uncertainties and disturbances.
Adetola Oke   +3 more
doaj   +1 more source

Bone and Soft Tissue Neoplasms in Infants Versus Older Children: A Report From the Cancer in Young People in Canada Program

open access: yesPediatric Blood &Cancer, EarlyView.
ABSTRACT Background and Aims Infant bone and soft tissue neoplasms present distinct clinical challenges and lack large‐scale data to inform treatment decisions. This study aims to characterize bone and soft tissue neoplasms in infants in Canada and to compare their outcomes with those of older pediatric patients.
Samuel Sassine   +21 more
wiley   +1 more source

Scheduling Optimization of Linear Schedule with Constraint Programming

open access: yesComputer-Aided Civil and Infrastructure Engineering, 2018
In recent decades, construction project scheduling optimization has received extensive attention from the research community. However, the most commonly used scheduling approach, the critical path method, is often inapplicable to transportation-type linear projects.
Yuanjie Tang   +4 more
openaire   +2 more sources

Impact of Initial Treatment Setting on Survival in Relapsed Pediatric and AYA Bone Sarcomas: A Secondary Analysis of a Prospective Clinical Trial

open access: yesPediatric Blood &Cancer, EarlyView.
ABSTRACT Background Outcomes in relapsed or refractory pediatric and AYA bone sarcomas remain poor, and the impact of early referral to specialized sarcoma centers on survival is unclear. Early centralization of care may improve local and systemic treatment quality, but evidence in this population is limited.
Justyna Antoniuk‐Majchrzak   +9 more
wiley   +1 more source

Properties of optimal schedules in preemptive shop scheduling

open access: yesDiscrete Applied Mathematics, 2011
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Philippe Baptiste   +5 more
openaire   +4 more sources

An optimal day-ahead scheduling method for power systems considering extreme, unanticipated and dynamic-temporal scenarios

open access: yesZhejiang dianli
Existing optimal scheduling methods cannot cover all unanticipated scenarios. To overcome this limitation, this paper proposes an optimal day-ahead scheduling method that considers extreme, unanticipated and dynamic-temporal scenarios.
SUN Junjie   +5 more
doaj   +1 more source

Group Elevator Peak Scheduling Based on Robust Optimization Model

open access: yesAdvances in Electrical and Computer Engineering, 2013
Scheduling of Elevator Group Control System (EGCS) is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently.
ZHANG, J., ZONG, Q.
doaj   +1 more source

Home - About - Disclaimer - Privacy