Determination of payback periods for photovoltaic systems in domestic properties [PDF]

open access: yes, 2012
The paper reports on the two year performance of photovoltaic (PV) systems which were installed on 23 new build properties in South Yorkshire, UK, and the impact of the feed-in-tariff on payback periods. The majority of the properties (17 No.) were fitted with a 3.02 kiloWatt peak (kWp) photovoltaic system, designed to supply, on average, up to 2400 ...
O'Flaherty, Fin   +2 more
openaire  

Optimization of dual-cooling technique in perforated solar pv modules: experimental insights towards carbon neutrality and sustainability

open access: yesEnergy Conversion and Management: X
Improving the performance of photovoltaic modules by optimizing cooling techniques is crucial for achieving carbon neutrality, a key goal in sustainable energy systems through energy-saving strategies.
Ahssan M.A. Alshibil   +6 more
doaj   +1 more source

How did constitutional court deal with judging payback period of investment to solar power plants

open access: yes, 2015
This contribution deals with approach of Constitutional Court to assessing payback period of investment to solar power plant projects in Czech Republic. The main aim of the article is to confirm the hypothesis that Constitutional Court of Czech Republic ...
Valachová Martina
core  

Economic feasibility of using agrivoltaics for tomato farming

open access: yesFood and Energy Security
Agrivoltaics or agrophotovoltaics (APV), which simply describes farming under a canopy of PV panels, has been recently gaining a wider implementation to improve farming yields as well as generate electricity on the same piece of land. The presented study
Kago Rabasoma   +2 more
doaj   +1 more source

Contribution to the Formulation of Economically Efficient Subsidy Policy in the Area of Small Hydro Power Plants

open access: yesLittera Scripta, 2014
This paper analyzes the economic aspects of subsidy policy in the area of small hydro power plants. It confronts the current practice with the theory and proposes an economically effective solution. It is the first of a series of contributions devoted to
Simona Hašková, Ivo Chládek, Pavel Kolář
doaj  

Economic Feasibility of Green Building Certification in India: A Payback Period and Life-Cycle Cost Analysis

open access: yes
India's construction sector accounts for nearly one-third of national electricity consumption and a rapidly growing share of embodied carbon, making green building certification a policy priority under the National Mission on Sustainable Habitat. Despite
Mansi Mansi, Vanika Fatehchandka
core   +1 more source

MULTISTRUCTURAL SIMULATION OF PAYBACK PERIOD OF PROJECT DECISIONS

open access: yesIzvestiya Visshikh Uchebnykh Zavedenii. Chernaya Metallurgiya = Izvestiya. Ferrous Metallurgy, 2016
S. M. Kulakov   +3 more
openaire   +2 more sources

Life cycle cost analysis and payback period of lighting retrofit at the University of Malaya

open access: yes
This study presents the potential energy saving, life cycle cost analysis and payback period of the lighting system in campus buildings of the University of Malaya, Malaysia.
Nursahida, M.A.   +2 more