Results 191 to 200 of about 3,406,214 (250)
Some of the next articles are maybe not open access.
Research and Application of The PDCA Cycle in Artificial Intelligence Management Systems
Strategies for Policy in Science and Education-Strategii na Obrazovatelnata i Nauchnata PolitikaThe Plan – Do – Check – Act (PDCA) cycle is the basis of the process approach applied in ISO management system standards. The experience gained in working with management systems and summarized in the author’s monograph have been creatively adapted and ...
Tzvetelin Gueorguiev
semanticscholar +1 more source
2024 Congreso Internacional de Innovación y Tendencias en Ingeniería (CONIITI)
This article analyzes the influence of Inbound Marketing and the PDCA cycle (Plan, Do, Check, Act) on the adoption of best practices for customer loyalty in a small and medium-sized enterprise (SME) in the retail sector.
Rodrigo Rojas Mansilla +3 more
semanticscholar +1 more source
This article analyzes the influence of Inbound Marketing and the PDCA cycle (Plan, Do, Check, Act) on the adoption of best practices for customer loyalty in a small and medium-sized enterprise (SME) in the retail sector.
Rodrigo Rojas Mansilla +3 more
semanticscholar +1 more source
Kaizen Implementation in the Motorcycle Tire Testing Stage with the PDCA Cycle
IJIEM - Indonesian Journal of Industrial Engineering and ManagementThe research was conducted at the tire trial stage at a motorcycle tire production company, which aims to reduce defects in the measurement results at the tire sample trial stage.
Popy Yuliarty +2 more
semanticscholar +1 more source
2006
To achieve continuous quality improvements each organization needs to use an appropriate selection of tools and techniques. The fundamental requirements for success in that endeavour are a clear understanding, both of the tools and techniques as well as the process by which they could be applied.
Soković, Mirko, Pavletić, Duško
openaire +2 more sources
To achieve continuous quality improvements each organization needs to use an appropriate selection of tools and techniques. The fundamental requirements for success in that endeavour are a clear understanding, both of the tools and techniques as well as the process by which they could be applied.
Soković, Mirko, Pavletić, Duško
openaire +2 more sources
Application of PDCA Cycle in the Performance Management System
2008 4th International Conference on Wireless Communications, Networking and Mobile Computing, 2008The market competition worldwide being increasingly fierce, numerous organizations come to realize the importance to enhance their own performances. Therefore, most organizations are questing how to optimize their own performance management (PM). This thesis introduces the basic principle, characteristics and operational procedure of PDCA cycle (plan ...
Qing-Ling Du +3 more
openaire +1 more source
A framework to guide and support the design of a smart city based on the PDCA cycle approach
Journal of Systems and Information TechnologyPurpose Information and communication technologies brought a new paradigm that allows policymakers to ground their actions on real-time events. Smart cities were initially conceived as a technological vision separate from urban planning.
Diogo Correia +2 more
semanticscholar +1 more source
The Application of PDCA Cycle Management in Project Management
2015 International Conference on Computer Science and Applications (CSA), 2015Two important stages of project management are decision-making stage and implementation stage. In the decision-making stage of the project, the main task of management is to target planning and target demonstration. In the implementation stage of the project, the core task of the project management is the target control. Due to long-term and complexity
Meng-Meng Ren +3 more
openaire +1 more source
Inspection Planning Improvement Framework Based on the PDCA Cycle
Inspection Planning (IP) is critical to assure product quality during the Manufacturing Stage. IP takes place mainly during the stage of Process Development and is considered an inflexible static output resulting from the initial plan. However, revisions can become necessary according to the manufacturing system’s dynamic situation.Angélica Muffato Reis +2 more
openaire +2 more sources
A PDCA Cycle Analysis of Revitalization Project's Performance Management
2012The Revitalization Project was to reflect radical changes in the idea and philosophy of rural development. The Revitalization Project which started in 2005 was terminated in 2010. Accordingly, we need to analyze the policy outcomes of Revitalization Project. This study verified the operation planning for performance management of Revitalization Project
Son, Eunil, Son, Eunil
openaire +1 more source

