Development of a model to predict peak particle velocity in a blasting operation
International Journal of Rock Mechanics and Minings Sciences, 2011Ground vibrations arising from rock blasting is one of the fundamental problems in the mining industry, and predicting it plays an important role in the minimization of environmental complaints. To evaluate and calculate the blast-induced ground vibration by incorporating blast design and rock strength, artificial neural networks (ANN) and dimensional ...
H. Dehghani, M. Ataee-pour
exaly +2 more sources
Modified Scaled Distance Equation Used for Estimation of Peak Particle Velocity
Scaled distance equations used for estimating peak particle velocity have been developed by some researchers. The most widely used equation among these is the equation developed by Duvall and Fogelson. However, the equation has not exactly estimated the peak particle velocity correctly.
Tosun, ABDURRAHMAN
core +4 more sources
Engineering With Computers, 2016
Blasting is a widely used technique for rock fragmentation in surface mines and tunneling projects. The ground vibrations produced by blasting operations are the main concern for the industries undertaking blasting operations, which can damage the surrounding structures, adjacent rock masses, roads and slopes in the vicinity.
Danial Jahed Armaghani +2 more
exaly +3 more sources
Blasting is a widely used technique for rock fragmentation in surface mines and tunneling projects. The ground vibrations produced by blasting operations are the main concern for the industries undertaking blasting operations, which can damage the surrounding structures, adjacent rock masses, roads and slopes in the vicinity.
Danial Jahed Armaghani +2 more
exaly +3 more sources
Measurement: Journal of the International Measurement Confederation, 2021
Abstract Peak particle velocity (PPV) is the most basic and direct parameter of vibration event to connect with stress increment, so they are studied in this paper through statistics and analysis. The vibration events in underground coal mine can be divided into whole mine (WM) event, working face (WF) event and heading face (HF) event, and the WM ...
Wenlong Zhang
exaly +2 more sources
Abstract Peak particle velocity (PPV) is the most basic and direct parameter of vibration event to connect with stress increment, so they are studied in this paper through statistics and analysis. The vibration events in underground coal mine can be divided into whole mine (WM) event, working face (WF) event and heading face (HF) event, and the WM ...
Wenlong Zhang
exaly +2 more sources
Estimation of peak particle velocity using soft computing technique approaches: a review
Noise and Vibration Worldwide, 2018Ground vibrations caused by blasting are undesirable consequences in the mining industry. It can cause serious damage to the nearby buildings and facilities. Hence, such vibrations have to be controlled to reduce the damage to the environment, and this may be achieved by predicting the blast peak particle velocity. The induced peak
R Prashanth, D S Nimaje
exaly +2 more sources
Peak Particle Velocity for Blasting Rock Modeling
57th U.S. Rock Mechanics/Geomechanics Symposium, 2023ABSTRACT Blasting mechanisms are a complex coupling of the rock mass properties and the explosive detonation performance as well as the blast design parameters. Both rock mass and explosive properties have parameters that are inherently not well defined.
R. Yang, S. Green
openaire +1 more source
Prediction of peak particle velocity and peak air pressure generated by buried explosion
International Journal of Mining and Geological Engineering, 1988Three sets of different formulae expressed as functions of dynamic elastic constants of rock and some design parameters involved in a buried explosion are derived explicitly for the prediction of peak particle velocity (PPV) and peak air pressure (PAP).
R.N. Gupta, P. Pal Roy, B. Singh
openaire +1 more source
Selection of Blasting Design Parameters Affecting Peak Particle Velocity—a Case Study
Mining, Metallurgy & Exploration, 2021The present study has been conducted in surface limestone mine to select the controllable blasting design parameters affecting the peak particle velocity (PPV) for assessment of ground vibration. The study aims at using two prominent statistical tools, namely, principal component analysis (PCA) and stepwise selection and elimination (SSE) techniques ...
Punit Paurush +2 more
openaire +1 more source
Application of cuckoo search algorithm to estimate peak particle velocity in mine blasting
Engineering with Computers, 2016Ground vibration is one of the most undesirable effects of blasting operation in surface mines. Therefore, it seems that the prediction of ground vibrations with a high degree of accuracy is necessary to reduce environmental effects. This article proposes a novel swarm intelligence algorithm based on cuckoo search (NSICS) to create a precise equation ...
Nazanin Fouladgar +2 more