Results 261 to 270 of about 2,456,847 (309)
Some of the next articles are maybe not open access.
Improving efficiency of material flows in an automotive assembly plant: A case study
CIRP Journal of Manufacturing Science and Technology, 2021Evanthia Thanou
exaly
Plant, Materials and Workmanship
Clause 7 deals with the quality of the Contractor’s work, the Engineer’s verification thereof, remedies if the Contractor’s work is not in accordance with the Contract and some additional provisions on ownership and royalties. The quality assurance systems referred to in Sub-Clause 4.9 [Quality Management and Compliance Verification Systems] must be ...openaire +1 more source

