Results 91 to 100 of about 2,144,665 (111)
A Modular Implementation to Handle and Benchmark Drift Correction for High-Density Extracellular Recordings. [PDF]
Garcia S +5 more
europepmc +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
Prefabricated Construction Process Optimization Based on Rework Risk
Journal of Construction Engineering and Management - ASCE, 2022Xiaodong Li, Xinying Cao
exaly
Optimization of the Rework of Bended OLED Displays by Surface-Energy Control
Coatings, 2021Kwan-Young Han +2 more
exaly
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2020
Binghai Zhou
exaly
Binghai Zhou
exaly
Economic optimization of off-line inspection with rework consideration
European Journal of Operational Research, 2009Shey-Huei Sheu +2 more
exaly
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
Applied Mathematics Letters, 2010Yuan-Shyi Peter Chiu, Huei-Hsin Chang
exaly
Incorporating rework into construction schedule analysis
Automation in Construction, 2011Tarek Hegazy, Moustafa Kassab
exaly
Integrated Design Process for Modular Construction Projects to Reduce Rework
Sustainability, 2020Jeonghoon Lee +2 more
exaly

