Results 251 to 260 of about 7,252,275 (293)
Some of the next articles are maybe not open access.
An Application of Lagrangian Relaxation to Scheduling in Power-Generation Systems
Operations Research, 1977Two major decisions are made when scheduling the operations of a fossil-fuel power-generating system over a short time horizon. The “unit commitment” decision indicates what generating units are to be in use at each point in time. The “economic dispatch” decision is the allocation of system demand among the generating units in operation at any point ...
John A. Muckstadt, Sherri A. Koenig
openaire +1 more source
Power generator scheduling by dynamic programming
European Journal of Operational Research, 1977Abstract Dynamic programming is applied to the problem of determining an optimal short-run schedule for a series of power generating units to meet a time varying system load. Typical scheduling procedures include a priority ordering constraint which requires that units be committed to or removed from power production in a fixed order.
Powell, John, Gleason, John, Burton, Jon
openaire +2 more sources
Generation Scheduling in a system with Wind Power
2005 IEEE/PES Transmission & Distribution Conference & Exposition: Asia and Pacific, 2005In recent years, environmental concerns have significantly increased the pressure for cleaner and more efficient generation of electricity. In the UK and some European countries, there are requirements to produce a certain amount of electricity from renewable generation. Wind power is expected to contribute significantly to the renewable energy targets
null Furong Li, B. Kuri
openaire +1 more source
Power generation scheduling by neural network
International Journal of Systems Science, 1992A new method for solving a power generation scheduling problem in an electric power system is presented. The objective is to determine the hourly start-up/ shut-down schedules of all generators so that forecasted hourly power demands per day may be met and total operating costs, the sum of setup and fuel costs for a given day, may be minimized.
KENICHI AOKI +3 more
openaire +1 more source
Evolutionary Generator Maintenance Scheduling in Power Systems
2007No
Dahal, K., Galloway, S.J.
openaire +3 more sources
An expert system for power generation scheduling
Proceedings of the International Workshop on Artificial Intelligence for Industrial Applications, 2003A prototype of an expert system is presented which assists planners in making power generation schedules. The system takes advantage of knowledge engineering to overcome some drawbacks of conventional methods. Since the scheduling problem is too large to solve, it is divided into several subscheduling problems.
S. Osaka, M. Amano, J. Kawakami
openaire +1 more source
Environment-aware power generation scheduling in smart grids
2015 IEEE International Conference on Smart Grid Communications (SmartGridComm), 2015Air pollutants generated by thermal power plants have been a major source of environmental and health hazard. This paper develops an optimal mechanism for generation scheduling of a hybrid power system consisting of conventional and renewable power plants while maintaining the air-pollutant concentration below a targeted level.
Zhiheng Xu, Quanyan Zhu
openaire +2 more sources
Two-stage stochastic power generation scheduling in microgrids
2014 IEEE 27th Canadian Conference on Electrical and Computer Engineering (CCECE), 2014In this study, the power scheduling problem in μ-grids is investigated taking the uncertainties in power demand and wind power into account. The problem is formulated as a stochastic mixed-integer linear optimization problem with the objective being minimizing the total μ-grid cost.
Abdelsalam A. Eajal +3 more
openaire +2 more sources
Economic Scheduling of Generators in an Interconnected power system
2020 6th International Conference on Advanced Computing and Communication Systems (ICACCS), 2020In a typical power generating system cost optimization performs crucial act to deliver power to the consumers at lowest possible price. This cost optimization is achieved by proper scheduling of all available generators based on their fuel costs. This means that the real & reactive power flows of all units, allowed changing within their acceptable ...
G V Appa Rao, P Rama Krishna
openaire +1 more source
Evolutionary hybrid approaches for generation scheduling in power systems
European Journal of Operational Research, 2007zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Dahal, Keshav P. +2 more
openaire +4 more sources