Results 81 to 90 of about 7,524,988 (159)

Improving the efficiency and reliability of India’s power grid through targeted EHV transmission line investments: a case of UPPCL

open access: yesScientific Reports
This study analyzes the optimization of Extra High Voltage (EHV) transmission line design parameters by Uttar Pradesh Power Corporation Limited (UPPCL) in India to improve power grid efficiency and reliability. UPPCL reduced insulation specifications for
Sarika Shrivastava   +4 more
doaj   +1 more source

Development and control of an autonomously obstacle-navigation inspection robot for extra-high voltage power transmission lines

open access: yes, 2006
This paper presents a mobile robot suspended on power transmission lines based on a novel movement mechanism with two manipulators and a body. After the inspection robot configuration is described, the kinematics of the inspection robot and the process ...
Fang LJ(房立金)   +3 more
core  

Kansas Electric Transmission Authority 2009 Annual Report to the Governor and the Legislature

open access: yes, 2010
January 11, 2010KETA was created in 2005 by enactment of HB 2263. Our mission is to ensure reliable operation of the electrical transmission system, diversify and expand the Kansas economy and facilitate consumption of Kansas energy through improvements ...
Kansas Electric Transmission Authority
core  

Kansas Electric Transmission Authority 2011 Annual Report to the Governor and the Legislature

open access: yes, 2012
February 29, 2012KETA was created in 2005 by enactment of HB 2263. Our mission is to ensure reliable operation of the electrical transmission system, diversify and expand the Kansas economy and facilitate consumption of Kansas energy through improvements
Kansas Electric Transmission Authority
core  

Autonomous Inspection Robot for Power Transmission Lines Maintenance While Operating on the Overhead Ground Wires

open access: yesInternational Journal of Advanced Robotic Systems, 2011
This paper describes the development of a mobile robot capable of clearing such obstacles as counterweights, anchor clamps, and torsion tower. The mobile robot walks on overhead ground wires in 500KV power tower.
Zheng Li, Yi Ruan
doaj  

Kansas Electric Transmission Authority 2007 Annual Report to the Governor and the Legislature

open access: yes, 2008
January 14, 2008KETA was created in 2005 by enactment of HB 2263. Our mission is to ensure reliable operation of the electrical transmission system, diversify and expand the Kansas economy and facilitate consumption of Kansas energy through improvements ...
Kansas Electric Transmission Authority
core  

Kansas Electric Transmission Authority 2013 Annual Report to the Governor and the Legislature

open access: yes, 2014
January 13, 2014KETA was created in 2005 by enactment of HB 2263. Our mission is to ensure reliable operation of the electrical transmission system, diversify and expand the Kansas economy and facilitate consumption of Kansas energy through improvements ...
Kansas Electric Transmission Authority
core  

BASIC PRINCIPLES OF ORGANIZING OF REPAIR OF A NEW GENERATION OF ELECTRIC POWER LINES 220 kV AND ABOVE

open access: yesProblems of the Regional Energetics, 2011
The article describes the requirements for repair work on single circuit and double circuit overhead transmission lines of compact (VL) and controlled self-compensating high voltage transmission power lines (CSHVL).These include overhead power lines to a
Postolaty V.M.   +6 more
doaj  

Kansas Electric Transmission Authority 2015 Annual Report to the Governor and the Legislature

open access: yes, 2016
January 11, 2016KETA was created in 2005 by enactment of HB 2263. Our mission is to ensure reliable operation of the electrical transmission system, diversify and expand the Kansas economy and facilitate consumption of Kansas energy through improvements ...
Kansas Electric Transmission Authority
core  

Kansas Electric Transmission Authority 2006 Annual Report to the Governor and the Legislature

open access: yes, 2007
January 8, 2007KETA was created in 2005 by enactment of HB 2263. Our mission is to ensure reliable operation of the electrical transmission system, diversify and expand the Kansas economy and facilitate consumption of Kansas energy through improvements ...
Kansas Electric Transmission Authority
core  

Home - About - Disclaimer - Privacy