Results 21 to 30 of about 3,527 (306)

Partially Preemptive Multi Skill/Mode Resource-Constrained Project Scheduling with Generalized Precedence Relations and Calendars [PDF]

open access: yes, 2023
International audienceMulti skill resource-constrained project scheduling Problems (MS-RCPSP) have been object of studies from many years. Also, preemption is an important feature of real-life scheduling models.
Alvarez, Nahum   +2 more
core   +1 more source

GRASP and Iterated Local Search-Based Cellular Processing algorithm for Precedence-Constraint Task List Scheduling on Heterogeneous Systems

open access: yesApplied Sciences, 2020
High-Performance Computing systems rely on the software’s capability to be highly parallelized in individual computing tasks. However, even with a high parallelization level, poor scheduling can lead to long runtimes; this scheduling is in itself an NP ...
Alejandro Santiago   +6 more
doaj   +1 more source

A Constraint-Based Declarative Programming Framework for Scheduling and Resource Allocation Problems [PDF]

open access: yesVietnam Journal of Computer Science, 2019
Scheduling and resource allocation problems are widespread in many areas of today’s technology and management. Their different forms and structures appear in production, logistics, software engineering, computer networks, project and human resources ...
Jarosław Wikarek, Paweł Sitek
doaj   +1 more source

A Constraint Programming Formulation of the Multi-Mode Resource-Constrained Project Scheduling Problem for the Flexible Job Shop Scheduling Problem

open access: yesIEEE Access, 2023
In this work, a constraint programming (CP) formulation of the multi-mode resource-constrained project scheduling problem (MMRCPSP) is proposed for solving the flexible job shop scheduling problem (FJSSP) under the makespan minimization criterion.
Francisco Yuraszeck   +4 more
doaj   +1 more source

An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance [PDF]

open access: yesJournal of Project Management, 2023
In reality, the machines may interrupt because of the nature of deterioration of the machines. Thus, it is inevitable to perform maintenance alongside production planning. The preventive maintenance is a schedule of strategic operations that are
T. Jayanth Kumar, M. Thangaraj
doaj   +1 more source

A Constraint Programming Method for Advanced Planning and Scheduling System with Multilevel Structured Products

open access: yesDiscrete Dynamics in Nature and Society, 2014
This paper deals with the advanced planning and scheduling (APS) problem with multilevel structured products. A constraint programming model is constructed for the problem with the consideration of precedence constraints, capacity constraints, release ...
Yunfang Peng, Dandan Lu, Yarong Chen
doaj   +1 more source

Time-Efficient Allocation Mechanisms for Crowdsensing Tasks with Precedence Constraints

open access: yesSensors, 2019
Crowdsensing has emerged as an efficient and inexpensive way to perform specialized tasks by leveraging external crowds. In some crowdsensing systems, different tasks may have different requirements, and there may be precedence constraints among them ...
Xiaocan Wu   +4 more
doaj   +1 more source

Minimizing Energy Consumption Scheduling Algorithm of Workflows With Cost Budget Constraint on Heterogeneous Cloud Computing Systems

open access: yesIEEE Access, 2020
Cloud computing is a promising platform to conduct large-scale workflow applications according to the pay-per-use model. Minimizing the energy consumption of precedence constrained workflows with cost budget constraints has become one of the popular ...
Longxin Zhang   +4 more
doaj   +1 more source

Budget Minimization with Precedence Constraints

open access: yesCoRR, 2019
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are completed. Further, each job $j \in N$ is assigned real valued costs $c_{j}$, which can be negative or positive.
Marinus Gottschau   +3 more
openaire   +2 more sources

Home - About - Disclaimer - Privacy