Results 141 to 150 of about 8,389 (162)
Some of the next articles are maybe not open access.
A Stochastic Scheduling Problem with Intree Precedence Constraints
Operations Research, 1988We consider n jobs to be scheduled on two parallel machines. The jobs are subject to intree precedence constraints, that is, each job, except one which is the root of the tree, has one successor. The job of the root is at level 0 and a job is at level l if its predecessor is at level l − 1.
openaire +1 more source
A Decomposition Algorithm for Sequencing with General Precedence Constraints
Mathematics of Operations Research, 1981Many important unconstrained job sequencing problems for which optimal algorithms exist satisfy the adjacent job interchange property. In recent years, a more general property, the adjacent sequence interchange property, has been identified and shown to be a sufficient condition for the existence of efficient algorithms for sequencing problems with ...
openaire +2 more sources
Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints
International Journal of Production Economics, 2012Hengyong Tang, Chuanli Zhao
exaly
An efficient genetic algorithm for the traveling salesman problem with precedence constraints
European Journal of Operational Research, 2002Yoonho Seo, Chiung Moon
exaly
Decentralized multi-robot allocation of tasks with temporal and precedence constraints
Advanced Robotics, 2017Maria L Gini, Ernesto Nunes
exaly
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
International Journal of Production Economics, 2000Valerie Botta-Genoulaz
exaly

