Results 21 to 30 of about 8,389 (162)

Online List Access with Precedence Constraints

open access: yesCoRR, 2021
This paper considers a natural generalization of the online list access problem in the paid exchange model, where additionally there can be precedence constraints ("dependencies") among the nodes in the list. For example, this generalization is motivated by applications in the context of packet classification.
Maciej Pacut   +5 more
openaire   +2 more sources

Single machine scheduling problems with sequence-dependent setup times and precedence delays

open access: yesScientific Reports, 2022
Sequence-dependent setup times and precedence delays occur frequently in various production environments. This study investigates the single machine scheduling problem with setup times and precedence delays that occur in an amplifier assembly company ...
Shih-Wei Lin, Kuo-Ching Ying
doaj   +1 more source

Solving Location Assignment and Order Picker-Routing Problems in Warehouse Management

open access: yesAxioms, 2023
One of the critical warehousing processes is the order-picking process. This activity consists of retrieving items from their storage locations to fulfill the demand specified in the pick lists.
Johanna Bolaños-Zuñiga   +2 more
doaj   +1 more source

关于有固定工件和序约束的单机最小化最大流程排序问题的注记(A short note on the approximability of the single machine scheduling problem to minimize makespan with fixed jobs and precedence constraints)

open access: yesZhejiang Daxue xuebao. Lixue ban, 2008
The single machine scheduling problem to minimize makespan with fixed jobs and precedence constraints is considered. There are some fixed jobs which are already fixed in the schedule.
YANGAi-feng(杨爱峰)   +1 more
doaj   +1 more source

Transitive Reduction Approach to Large-Scale Parallel Machine Rescheduling Problem With Controllable Processing Times, Precedence Constraints and Random Machine Breakdown

open access: yesIEEE Access, 2023
This paper studied a novel parallel machine rescheduling problem with controllable processing times under machine breakdown and precedence constraints.
De Meng   +3 more
doaj   +1 more source

Budget Minimization with Precedence Constraints

open access: yesCoRR, 2019
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are completed. Further, each job $j \in N$ is assigned real valued costs $c_{j}$, which can be negative or positive.
Marinus Gottschau   +3 more
openaire   +2 more sources

An indirect search algorithm for disaster restoration with precedence and synchronization constraints

open access: yesPacific Journal of Mathematics for Industry, 2017
When a massive disaster occurs, to repair the damaged part of lifeline networks, planning is needed to appropriately allocate tasks to two or more restoration teams and optimize their traveling routes.
Akifumi Kira   +4 more
doaj   +1 more source

Performability Analysis of a Redundant Parallel Task in Network Systems

open access: yesIEEE Access, 2021
Recently, application of network systems (e.g., cloud computing systems) is increasingly prevalent for achieving integration, sharing and efficient utilization of various resources.
Min Tao, Xiwei Qiu, Peng Sun
doaj   +1 more source

Compact Models to Solve the Precedence-Constrained Minimum-Cost Arborescence Problem with Waiting Times

open access: yesAlgorithms, 2023
The minimum-cost arborescence problem is a well-studied problem. Polynomial-time algorithms for solving it exist. Recently, a new variation of the problem called the Precedence-Constrained Minimum-Cost Arborescence Problem with Waiting Times was ...
Mauro Dell’Amico   +2 more
doaj   +1 more source

Approximate Deadline-Scheduling with Precedence Constraints [PDF]

open access: yes, 2015
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence constraints. The goal is to compute a feasible schedule that minimizes the sum of penalties of late jobs. Lenstra
Efsandiari, Hossein   +5 more
openaire   +2 more sources

Home - About - Disclaimer - Privacy