Results 151 to 160 of about 622 (187)
Some of the next articles are maybe not open access.

HV/LV Prefabricated Substation Products and HV Installations in a Prefabricated Housing

22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013), 2013
The purpose of this article is to clarify the scope of application of HV/LV prefabricated substations and HV installations within a prefabricated enclosure which meets customer expectations. In this context, any functional analysis of an HV/LV substation within a prefabricated enclosure should at least cover the topics specified in the product standard.
T. Cormenier   +4 more
openaire   +1 more source

The Application and Development of Prefabricated Prefabricated Buildings in Housing Construction

城市建设理论研究—建筑结构
Prefabricated building is a type of construction where components are produced in a factory, transported to the construction site, and directly assembled into a building through certain connection methods. Its advantages include: shortening construction period, improving construction efficiency, saving energy, and reducing pollution.
openaire   +1 more source

Aging Society in Wroclaw’s Prefabricated Housing Estates

2016
The paper presents following researches: study the social transformations in selected prefabricated housing estates related to the aging of the society (age structure, family status, physical fitness), conduct social research on the elderly in selected prefabricated housing estates (household structure, family status, physical fitness, assessment of ...
Barbara E. Gronostajska   +1 more
openaire   +1 more source

Prefabrication in public housing

2008
Master of Science (International Construction Management)
Chew, Yoke Leng., Tan, Tze Hui.
openaire   +1 more source

The Prefabrication of Houses.

The Journal of Finance, 1952
A. W. Zelomek, Burnham Kelly
openaire   +1 more source

Japanese prefabricated timber house construction

Habitat International, 1990
In Japanese wooden house construction, it is general that, for the erection of a house, timber is assembled and the work is completed up to the roof framing in one or two days. For the preparation of the erection, a carpenter must perform inking on the timber based on Ztuzu, and then must cut joints. This work requires several weeks.
openaire   +1 more source

Prefabricated housing, a solution for Ghana's housing shortage

2011
Sub-Saharan Africa has been experiencing phenomenal population growth since the beginning of the 20th Century, following several centuries of population stagnation attributable to the slave trade and colonization. The region's population in fact increased from 100 million in 1900 to 770 million in 2005.
openaire   +1 more source

Home - About - Disclaimer - Privacy