Results 61 to 70 of about 8,064 (275)

A Mobile System for the On-Site Assembly of Timber Frame Components: The Development of an Agile, Low-Cost Alternative to Offsite Prefabrication

open access: yesSustainability, 2022
Prefabricated timber component-based systems are the most prevalent industrialised system used to build housing. Along with many other countries, the UK has invested in different types of factory-based prefabrication systems as a means of increasing ...
Stuart Gee, Andre Brown
semanticscholar   +1 more source

Multi‐Functional Adaptive Interfaces for Next‐Generation Wearable and Implantable Bioelectronics

open access: yesAdvanced Science, EarlyView.
Adaptive Biointerfaces: A comprehensive overview of next‐generation bioelectronics is presented, highlighting mechano‐adaptive and biophysiologically adaptive interfaces that enable stable, long‐term integration with living tissues. As illustrated in the image, adaptive interface strategies, including mechano‐adaptivity (e.g., injectability, shape ...
Jinhong Park   +7 more
wiley   +1 more source

Complex Curved Storefront: The Looking Glass

open access: yesChallenging Glass Conference Proceedings, 2020
A bespoke structural glass storefront is designed for the P.C. Hooftstraat 138. Developer Warenar Real Estate assembled a design team with UNStudio, Arup and Octatube.
Chris Noteboom   +3 more
doaj   +1 more source

Vascularized Cardiac Tissue Engineering: From Advances in Biofabrication to Translational Applications

open access: yesAdvanced Science, EarlyView.
This review presents a process‐oriented framework for vascularized cardiac tissue engineering, highlighting how the coordinated design of cells, biomaterials, and biofabrication strategies enables the functional development or vascularized myocardium for disease modelling and drug discovery.
Yang Liu   +9 more
wiley   +1 more source

Towards digital automation flexibility in large-scale timber construction: integrative robotic prefabrication and co-design of the BUGA Wood Pavilion

open access: yesConstruction Robotics, 2020
This paper discusses the digital automation workflows and co-design methods that made possible the comprehensive robotic prefabrication of the BUGA Wood Pavilion—a large-scale production case study of robotic timber construction.
H. Wagner   +3 more
semanticscholar   +1 more source

AI Guided Protein Design for Next‐Generation Autogenic Engineered Living Materials

open access: yesAdvanced Intelligent Systems, EarlyView.
Autogenic engineered living materials (ELMs) integrate biology and materials science to create self‐regenerating and self‐healing materials. This perspective highlights emerging strategies in protein engineering and AI‐guided de novo design to expand the capabilities of autogenic ELMs.
Hoda M. Hammad, Anna M. Duraj‐Thatte
wiley   +1 more source

Bibliometric Analysis of the Intersection of Circular Economy, Prefabrication, and Modularity in the Building Industry

open access: yesBuildings
This study aims to examine the latest literature at the intersection of prefabrication, modularity, and the circular economy (CE) through a bibliometric analysis.
Nelson Soares, Vanessa Tavares
doaj   +1 more source

Studies of the Prefabricated Housing Construction Market in Poland

open access: yesSelected Scientific Papers: Journal of Civil Engineering, 2014
The directions of development of the construction market are not only related to the need to own one’s own home but also to increasing functional and economic requirements and conditions of sustainable development.
Radziszewska-Zielina Elżbieta   +1 more
doaj   +1 more source

Modular Electronic Microrobots With Onboard Sensor‐Program‐Steered Locomotion

open access: yesAdvanced Intelligent Systems, EarlyView.
Modular electronic smartlet microrobots integrate ambient‐light energy harvesting, photodetection, programmable CMOS control, and bubble‐based actuation within a sub‐millimeter fold‐up architecture. A 58‐bit on‐board CMOS chiplet enables sensor–program steered switching between independently addressable actuators, achieving closed‐loop 2D navigation in
Vineeth K. Bandari   +6 more
wiley   +1 more source

Constructability in industrial plants construction: a BIM-lean approach using the Digital Obeya Room framework

open access: yesJournal of Civil Engineering and Management, 2017
One of the main problems the construction industry faces is the high cost and slow execution time due to inadequate planning, which results in poor use of human resources.
Daniel Luiz de Mattos Nascimento   +4 more
doaj   +1 more source

Home - About - Disclaimer - Privacy